Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Port Saint Lucie, Florida. Working plans call for the renovation of a 37,416-square-foot, two-story above grade educational facility.
The owner has selected a construction manager as of August 21, 2024. The intent of this Request for Qualifications (RFQ) is to select a firm to provide Construction Management at Risk Services for construction of Western Grove K8. Commission Number #080123VB AR #AAC000886 The school campus consists of an administration/common education core facility building. Two (2) classroom buildings, an audeteria with kitchen facilities (designed as an Enhanced Hurricane Protection Shelter), gymnasium, play area, hardcourts, and a multi-purpose playing field. Other amenities include a bus loop, staff and guest parking. A covered walk extends from the bus drop-off location into the campus and connects to all buildings. Chiller and cooling tower equipment to be provided. The administration and common core education facility is a partial two (2) story facility with a total gross area of 37,416 sq. ft. This structure is connected at the second-floor level with an open structure bridge to each of the classroom buildings. Each classroom building is two (2) stories with a floor area of 31,024 sq. ft. per floor, each building contains 62,048 sq. ft. gross. The classroom building to the east of the admin/core facility contains grades K thru 1st on the first floor and the classroom building to the south of the admin core facility contains grades 2 thru 4 inclusive on the first floor. The second floor at the east classroom building contains grades 5 thru 6 inclusive, and the south 2nd floor classroom building contains grades 7 thru 8 inclusive. Each floor of both classroom buildings consists of four (4) classroom pods surrounding an interior extended learning area. Student and staff toilet facilities are located on each floor within each school grade pod. Laboratories, ESE classrooms, science demonstration classrooms, skills labs, etc. are dispersed within both the common core facility and classroom buildings. The audeteria is 33,569 sq. ft. gross and contains dining facilities, kitchen, custodial, stage, band classroom, vocal classroom, and art classroom. This building is to be designed as an EHPS Enhanced Hurricane Protection Shelter The gymnasium is 20,201 sq. ft. gross and contains a ticket booth, concessions area, dance room, multi-purpose classroom, gymnasium, boy's and girl's locker facilities, toilets, showers, and PE storage. The chiller building is 2,179 sq. ft. Accumulative gross building area for campus is 217,461 sq ft. Question Deadline 06/19/2024 at 3:00 PM ET Location : online portal. Any questions, requests for clarifications or interpretations regarding this RFQ during the submittal preparation period (or reporting errors, inconsistencies, or ambiguities) must be received in writing via email at kimberly.albritton@stlucieschools.org, directed to the attention of Mrs. Kimberly Albritton no later than the date/time listed in Section 4A, Schedule. The project is scheduled to be completed to begin school in August of 2026. New construction of a K8 campus for approx. 1,900 students at approximately 215,000sf comprised of 6 buildings.
Pre-Construction/Negotiated
Educational
$70,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 8, 2024
January 1, 2025
9461 Brandywine Ln, Port Saint Lucie, FL
Related To This Project
Port Saint Lucie, FL
Bid Date: Apr 22 2020
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: Aug 07 2024
Port Saint Lucie, FL
Bid Date: Dec 04 2024
Port Saint Lucie, FL
Bid Date: Jul 30 2024
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: Aug 22 2024
Port Saint Lucie, FL
Bid Date: Jun 28 2024
Port Saint Lucie, FL
Bid Date: Jul 08 2024
Port Saint Lucie, FL
--
Port Saint Lucie, FL
--
Port Saint Lucie, FL
Bid Date: Sep 18 2024
Port Saint Lucie, FL
Bid Date: Jun 03 2024
Port Saint Lucie, FL
Bid Date: May 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.