BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Charlottetown, Prince Edward Island. Completed plans call for the construction of a 1,024-square-foot, one-story above grade pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The Charlottetown Pollution Control Plant (CPCP) is requesting qualified builders to provide a quotation to construct a new storage building. The lump sum price to include supply and installation of the following items: o Building excavation, trenching, backfilling, placement and compaction of pipe bedding, select borrow, and granular material, grading, and reinstatement. o Storm pipe, catch basin structure, and waterline. o Asphalt preparation and placement. o Concrete foundation c/w reinforcing, slab-on-grade, and rigid insulation. o Wood frame construction including walls, sheathing and pre-engineered roof trusses. o Building envelope and openings including aluminium windows, overhead doors, insulated metal doors, frames, & hardware, batt insulation, vapour barrier, air barrier, metal siding c/w all accessories, and asphalt shingles c/w all trims, soffits, and accessories. o Heat pump. o Interior floor drains and piping. o Clean-up all and reinstatement of disturbed areas. o Work as indicated on the below drawings: o C01 Site Plan o A01 Floor Plan and Sections o A02 Elevations o A03 Details and Schedules o Delivery and disposal fees. Electrical including service entrance, lighting, and wiring devices, will be completed by others. The successful contractor is to complete the foundation on or before October 31, 2024 substantially complete all work on or before March 31, 2025. Documents are available at https://www.charlottetown.ca/ Direct all questions in respect to the Quotation in writing to: City of Charlottetown at tenders@charlottetown.ca. Notify the City not less than three (3) working days before Closing of omissions, errors, or ambiguities found in Contract Documents. If the City considers that correction, explanation, or interpretation is necessary, a written addendum will be issued. All addenda will form part of Contract Documents. It is the responsibility of Bidder to ensure all addenda have been received Question Deadline 06/17/2024

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$245,000.00

Public - City

New Construction, Site Work

6

15

10

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
25
Bidding Soon
174
All Active Projects
76
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2024

July 19, 2024

img_map_placeholder

Riverside Dr, Charlottetown, PE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.