BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 3, 2025

Site work for a water / sewer project in Salem, New Hampshire. Completed plans call for site work for a water / sewer project.

The rehabilitation of Millville Lake Dam consists of the drilling and installation of rock anchors through the existing dam spillway, concrete repairs to and raising of deteriorated portions of spillway training walls and cutoff walls, installation of new grouted riprap toe scour protection, installation of articulated concrete blocks (ACBs), construction of a reinforced concrete overlay, slip lining of the existing low-level outlet pipe, and minor land clearing. Any questions contact the Purchasing Agent, Gia Faccadio at gfaccadio@salemnh.gov.

Post-Bid

Water / Sewer

$800,000.00

Public - City

Site Work

14

7

7

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
569
Active Projects
324
Bidding Soon
4,116
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

July 29, 2024

Project location map

Millville Cir, Salem, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.