BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2025 at 8:00 PM

Updated October 21, 2025

Site work for a bridge / tunnel in Madison, Wisconsin. Completed plans call for site work for a bridge / tunnel.

The purpose of this document is to provide interested parties with information to enable them to prepare and submit a solicitation response for State Bridge Fiber Wrap Services on Bridge B-13-703, Edgerton Road over IH-39/90 NB. Project Location & Description B-13-703, Edgerton Road over IH 39/90: Repair girder 6, Span 2 (South exterior girder). Full wrap (inside and outside faces and bottom flange) from steel diaphragm to steel diaphragm over Lane 3 (Eastern-most) to the toe of the Eastern slope (Approximately 32 feet). FRP shall be painted to match existing girder color. Repair also includes crack injection in that same work area of 1/16" (0.063 inches) and larger crack width. Crack area is approximately 40LF. Daytime lane closures on this project are allowed Monday - Wednesday. Work can be done 7AM to 5PM. Contractor is responsible for all traffic control. The contractor will need to notify WisDOT 2 weeks in advance of the closure so that it can be approved and entered into LCS by WisDOT. Estimated 352 SF of FRP concrete surface repair , cleaning and sealing concrete girders , fiber wrap reinforcing nonstructural, traffic control The County intends to use the results of this process to award a contract(s) or issuance of purchase order for the product(s) and or services(s). Contact Information Hazel Schuster Purchasing Officer 210 Martin Luther King Jr Blvd Madison, WI 53703 Email: schuster.hazel@countyofdane.com Phone: (608) 896-3861 Vendor Question Submission Deadline:August 21, 2025, 4:00pm Question Response Deadline:August 25, 2025, 4:00pm All inquiries concerning this solicitation must be submitted via electronically. Requests submitted after that time frame will not be considered. In the event that it becomes necessary to provide additional clarifying data or information, or to revise any part of this bid, addenda and/or supplements will be posted electronically. The County reserves the right to accept any part of a submission deemed to be in the best interest of the County and to reject any and all proposals and to negotiate the terms of the contract, including the award amount, with the selected proposer prior to entering into a contract. If contract negotiations cannot be concluded successfully with the highest scoring proposer, the County may negotiate a contract with the next highest scoring proposer. Each proposal must be accompanied by a certified or cashier's check payable to the Dane County Public Works, Highway & Transportation Department, or a bid bond, as a guarantee in the amount of 5% of the total bid. Successful bidders shall furnish the County with a performance bond equal to 100% of the contracted amount (per State Statute 779.14). Work on all projects must be completed by October 31st, 2025

Award

Bridges / Tunnels

$51,650.00

Public - County

Site Work

3

6

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
216
Bidding Soon
1,757
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2025

September 26, 2025

Project location map

Multiple Locations, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.