BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2024 at 8:00 PM

Updated September 6, 2024

Site work for a bridge / tunnel in Nordegg, Alberta. Completed plans call for site work for a bridge / tunnel.

Construct Precast Prestressed Concrete Girder Bridge, Demolish Existing Bridge Structure and Other Work 11:04 Bf 75962 - Carrying Hwy 11:04 Over Watercourse, 39 Km Sw of Nordegg, Ab Kilometre 9.710 to 9.890 Central Region Approximate Quantities: 1 Lump Sum Traffic Accommodation for Bridge Construction 1 Lump Sum Demolition and Disposal of Bridge Structure 16 Piles Drill Rig Set-up (Drilled Piles) Pipe Piles 272 Metres Pile Installation (Drilled Piles) Pipe Piles 22,350 Kilogram Corrosion Resistant Reinforcing Steel Supply 105 Cubic Metres Concrete (Class Hpc) Supply and Place 750 Cubic Metres Heavy Rock Riprap (Class 2) Contractor to Supply All Materials.

Award

Bridges / Tunnels

$4,527,351.00

Public - State/Provincial

Site Work

31

5

2

6

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
10
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

September 1, 2024

Project location map

Multiple Locations, Nordegg, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.