BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, asbestos abatement, remodeling and renovation of a mixed-use development in Colton, New York. Completed plans call for the demolition of a educational facility; for the remodel of a educational facility; for the renovation of a educational facility; for site work for a educational facility; for asbestos abatement for a educational facility; road / highway; for paving for a road / highway; and water / sewer project.

The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. Each Bidder must obtain and submit with his Bid the Statement of Surety's Intent attached to the Bid form, completed and signed by a duly authorized surety company licensed to do business in New York State This provision is an addition to the existing prevailing wage rate law, Labor Law 220, Section 220-h. It requires that on all public work projects of at least $250,000.00, all laborers, workers and mechanics working on the site, be certified as having successfully completed the OSHA 10-hour construction safety and health course. It further requires that the advertised bids and contracts for every public work contract of at least $250,000.00, contain a provision of this requirement. DERAL REGULATIONS Work Includes: 1. Review Asbestos Abatement Contractors submittals and closeout package (See Section 02 8213 paragraph 1.08) for completeness and conformance with all applicable Code Rules and Regulations. 2. Provide the services of a testing laboratory and a technician under the direct supervision of a certified industrial hygienist to perform the specified functions during asbestos removal 3. operations. Perform background air sampling and required analysis of samples for each regulated work area as indicated prior to commencement of asbestos removal operations. 4. Conduct area sampling and required analysis of samples during each day of the asbestos abatement project. 5. Conduct aggressive clearance air sampling and required analysis of clearance samples for regulated work areas. The Asbestos Removal Contractor is responsible for all costs incurred for additional air sampling and analysis should a work area not pass the initial clearance sampling. 6. Oversee the scope, timing, phasing, remedial methods to be utilized on the asbestos abatement project and shall verify the completeness of the asbestos abatement. 7. The Environmental Consultant shall attend project meetings and act as the Owner's Liaison in all matters involving the Asbestos Abatement work. The Environmental Consultant shall schedule meetings as required to expedite the work and to correct issues concerning abatement in liaison with the Engineer, Owner, and Contractors. 8. Utilizing drawings provided by the Asbestos Designer of Record, quantify the type and quantities of daily removals. Submit drawings upon completion of project certifying that designated abatement work is complete. 9. Submit two (2) copies of the daily and three (3) copies of the final report to the Asbestos Designer of Record. 10. Observation of asbestos work area and procedures for at least 50% of the work day. 11. The Asbestos Project Monitor shall be on-site during all asbestos abatement activities including preparatory work, abatement, cleaning and demobilization. 12. When required provide variance application services. Each bid must be accompanied by certified check of the bidder or by a bid bond prepared on a standard approved form, duly executed by the bidder as principal, and having as surety thereon a surety company authorized to do business within the State of New York. Simultaneously with his delivery of the executed contract, the successful bidder must deliver to the Owner three (3) originals of an executed bond in the amount of 100% of the accepted bid as security for the faithful performance of the contract and for the payment of all persons performing labor or furnishing materials in connection therewith, prepared in the standard form of Performance Bond, Labor and Materials Payment Bond, AIA Form A312-2010 and having as surety thereon such surety company or companies as are acceptable to and approved by the Owner, and as are authorized to transact business in New York State Plans And Specifications Remain The Property Of BCA Architects & Engineers And Printed Must Be Returned In Good Condition Within Thirty (30) Business Days After Award Of Contract Or Rejection Of Bids Plans And Specifications Remain The Property Of BCA Architects & Engineers And Printed Must Be Returned In Good Condition Within Thirty (30) Business Days After Award Of Contract Or Rejection Of Bids.

Bid Results

Educational

$113,000.00

Public - City

Asbestos Abatement, Demolition, Paving, Remodeling, Renovation, Site Work

119

31

13

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
97
Bidding Soon
1,599
All Active Projects
604
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 5, 2024

img_map_placeholder

To Be Determined, Colton, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.