Renovation of a transportation facility in Seattle, Washington. Completed plans call for the renovation of a transportation facility.

Project no. 0012584.05, AMC #23902 This project provides Installation of Access Control devices to approximately 67 Comm Room doors. Doors will be treated with all or a combination of the following; multi-factor authentication control devices (biometric card readers, horns/strobes/intercom), surveillance cameras, electrified mortise locks, power hinges, door handle hardware, door strikes and contact sensors, associated wiring and conduit, connection to the existing Port Access Control, system, door signage, and infrastructure equipment. Mandatory 15% apprentice labor hours of the total labor hours are a requirement, of the construction contract. The WMBE utilization goal is 10% for this contract. Any person who believes they have been aggrieved by an unlawful discriminatory practice under Title VI has a right to file a formal complaint with the Port. Any such complaint must be in writing and filed with the Port's Title VI Coordinator within one hundred, eighty (180) days following the date of the alleged discriminatory occurrence. Title VI Discrimination Complaint Forms may be obtained from the office of the Title VI Coordinator at no cost to the complainant by calling (206) 787-4066 or sending an email to mailbox.t3@portsea.ttle.org. The Engineer's estimate range for this project is $2.4M - $2.9M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Transportation Terminals

$1,998,846.00

Public - State/Provincial

Renovation

181

23

5

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Fireplaces and Stoves, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Static Uninterruptible Power Supply
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Pathways for Communications Systems, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Container Processing and Packaging, Shipping Packaging, Labeling Equipment, Mobile Plant Equipment, General Vehicles, Carts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Air Pollution Control, Air Pollution Control Equipment, Cyclonic Separators, Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
39
Bidding Soon
1,007
All Active Projects
384
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

September 9, 2024

img_map_placeholder

To Be Determined, Seattle, WA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Access Controls in Comm Rooms

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.