BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Porterville, California. Completed plans call for site work for a educational facility.

DESCRIPTION OF WORK: The Work includes supplying, delivering, and installing via mulch blower 3,309 cubic yards of playground engineered wood fiber to multiple elementary school sites and multiple playground pits on those sites as noted on the attached site maps: Belleview-567 CY, John J. Doyle-307 CY, Los Robles-383 CY, Monte Vista-292 CY, Olive-369 CY, Roche-184 CY, Santa Fe-506 CY, Vandalia-234 CY, Westfield-467 CY. Completed DIR Information: Within 24 hours of the opening of the bids, the apparent low bidder shall submit completed DIR information on the Subcontractor List to the Porterville Unified School District at its offices located at 600 West Grand Avenue, Porterville, California 93257. BASIS FOR BIDS: Bids shall be on a lump sum basis TIME OF COMPLETION: The Work shall be completed within 20 calendar days from the date of the Owner's Notice to Proceed. QUALIFICATION OF BIDDER: The Owner will not consider or accept any bids from contractors or subcontractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code of the State of California, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the Contractor shall have a C-27 license and shall maintain that license in good standing through Project completion and all applicable warranty periods. Only contractors who are registered & approved with Quality Bidders as an approved Porterville Unified School Distric CUPCCAA bidder will be considered. Please see the following link to Porterville Unified School District website for information about our approved CUPCCAA bidder list and application: online Please see the following link to Quality Bidders website AWARD: The Owner reserves the right to reject any and all bids and/or waive any informality in any bid received and/or determine in its discretion the responsibility of any bidder, and which bid is most advantageous to the Owner. The owner reserves the right to reject any bid which excludes any part of the scope of work. Unless otherwise required by law, no bidder may withdraw his bid for a period of 30 days after the date set for the opening thereof, or any authorized postponement thereof. The Owner reserves the right to take more than 30 days to make a decision regarding the rejection of bids or the award of the Contract. PREVAILING WAGES: The Project is a public work and under California Labor Code Section 1770 et seq., the Director of the California Department of Industrial Relations ("DIR") has determined the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work in the locality in which the work is to be performed, for each craft, classification or type of worker needed to execute this Contract. Copies of the rates are on file at the Owner's principal office. It shall be mandatory upon the Contractor and on any subcontractor to pay not less than the said specified rates to all workers employed in the execution of this Agreement DIR REGISTRATION: The Owner will not accept any bid or enter into any contract without proof of the bidder's current registration to perform public work under Labor Code Section 1725.5. Bidders shall not accept any sub-bid or enter into any subcontract without proof of the subcontractor's current registration to perform public work under Labor Code Section 1725.5. LABOR COMPLIANCE: Contractor and all subcontractors shall comply with Labor Code Section 1776. In accordance with Labor Code section 1771.4(a)(1), the Project is subject to compliance monitoring and enforcement by the DIR. The Contractor and each subcontractor shall furnish a certified copy of all payroll records directly to the Labor Commissioner on a monthly basis, unless directed by the Owner to furnish such records more often, and in the format prescribed by the Labor Commissioner. Which said agreement dated _________________, _____, and all of the Contract Documents are hereby referred to and made a part hereof; and WHEREAS, the Principal is required, before entering upon the performance of the work, to file a good and sufficient bond with the body by whom the Contract is awarded to secure the claims arising under said agreement. TIME OF COMPLETION: The Work shall be completed within 20 calendar days from the date of the Owner's Notice to Proceed.

Post-Bid

Educational

$116,480.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
16
Bidding Soon
360
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

July 24, 2024

img_map_placeholder

Multiple Locations, Porterville, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.