BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Fort Collins, Colorado. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000354404 The City of Fort Collins is requesting bids from qualified Bridge Design & Manufacturers for the design, fabrication, and delivery of a pedestrian bridge made of welded self-weathering steel, with a concrete deck (which will be installed separately). The pedestrian bridge is part of the City's Poudre River Trail construction project. The selected Bridge Design & Manufacturer is required to provide digital files containing design calculations and detailed shop drawings to the City. The shop drawings must undergo review and approval by the City before fabrication of the bridge commences. The pedestrian bridge must comply with all current ADA requirements. The Bridge Design & Manufacturer will need to provide design calculations and shop drawings to bear the endorsement seal of a Professional Engineer registered in the State of Colorado, who is accountable for the bridge design. This ensures that the structural integrity and safety of the bridge meets the required standards. Plan layout and dimensions have been provided in Exhibit A - Draft Plan Set Poudre River Trail Concepts Structure Plans, along with applicable design criteria for the abutment design. This information is provided for the Bridge Design & Manufacturer to appropriately design and size the structure; however, the Bridge Design & Manufacturer shall provide applicable design criteria, specifications, and other details to ensure the ultimate safety and satisfactory performance of the structure. The delivery location is to be in the area depicted in Exhibit B - Pedestrian Bridge Location Map. Upon delivery of the bridge, the City's Contractor responsible for the Poudre River Trail construction project engaged under a separate contract will be tasked with off-loading the bridge. The Bridge Design & Manufacturer will provide a qualified representative on-site to oversee the off-loading and provide technical guidance for the off-load process as reasonably necessary. This division of responsibilities ensures a clear delineation of tasks and accountability. The funding for the bridge is derived from a combination of sources, including a Great Outdoors Colorado (GOCO) grant and City of Fort Collins' Conservation Trust Funds. Under a separate contract, the Poudre River Trail project will construct an extension from Ridgen Reservoir to Colorado State University's Environmental Learning Center. The procurement process for the bridge design and fabrication will be handled independently from the construction contract for the trail. Once the bridge is acquired, a City hired Contractor will be responsible for installing it. During installation, the Contractor will adhere to the specifications and requirements provided by the selected Bridge Design & Manufacturer. Question Deadline 06/14/2024 at 3:00 PM MT Questions are submitted online No, Any additional questions should be submitted, in writing via email, to Adam Hill at adhill@fcgov.com with a copy to Project Manager, Greg Oakes at goakes@fcgov.com, The City reserves the right to accept or reject any and all bids, and to waive any irregularities or informalities.

Conceptual

Bridges / Tunnels

$500,000.00

Public - City

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
66
Bidding Soon
915
All Active Projects
392
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

img_map_placeholder

I-25, Fort Collins, CO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.