BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Brandon, Manitoba. Completed plans call for the renovation of a medical facility.

Normal Power Upgrades to the Brandon Regional Health Centre within the existing campus Energy Centre. All Normal Power is to be maintained throughout the project and is to be sequenced with the ongoing Emergency Power Upgrades project that will run simultaneously to this project. Work generally includes: - Novation (Transfer) of existing equipment supply contracts from Bockstael Construction to the successful Electrical Subcontractor - Supply of remaining equipment and infrastructure - Installation, Testing, Commissioning, and Warranty of all Equipment - Sequencing and Temporary Power Accomodations during Installation - Structural and Ancillary Work related to Electrical Infrastructure Upgrades - Concrete Foundation Alterations Question Acceptance Deadline: 2024/06/28 04:00:00 PM CDT Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Medical

$200,000.00

Public - State/Provincial

Renovation

18

13

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
17
Bidding Soon
123
All Active Projects
68
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 16, 2024

August 12, 2024

img_map_placeholder

150 McTavish Ave E, Brandon, MB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.