Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Shaker Heights, Ohio. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The general scope of the project includes: o Installation of new sanitary sewers including removal & replacement or rehabilitation of existing sewers. The method of construction is a combination of open cut, auger boring and CIPP lining. o Replacement of existing 6-inch water main with a new 8-inch water main. o The replacement of pavement above the proposed sewer and water main trench and asphalt planning and resurfacing (mill and fill) where shown on the plans. The construction inspection services shall be performed in accordance with all applicable federal and state laws and regulations with oversight by the City of Shaker Heights. As federal funds are being used, the consultant shall confirm that the contractor is complying with all US EPA Build America, Buy America (BABA) policies and procedures. The Scope of Services shall include but not be limited to the following: The consultant shall provide an experienced licensed professional engineer as Construction Project Engineer (CPE) to perform construction management and oversee inspection services. The CPE shall serve as the City's liaison with the Contractor working through the Contractor's superintendent and assist him/her in understanding the detailed scope of intent of the contract documents. The services of the CPE shall consist of coordinating all aspects of the construction of the project for the City of Shaker Heights project manager. The City's project manager has authority over all decisions regarding design issues. The Construction Management Phase will commence with a written "Notice to Proceed" to the Contractor when directed by the City. The CPE will be the City's authorized representative during the construction phase to coordinate, monitor and administer the work of the Contractor and shall advise and consult with the City regarding all aspects of the Project. The CPE will have the authority to act on behalf of the City consistent with the terms and conditions set forth in the Agreement. The engineer's estimate for the project is $6,600,000. The general schedule for the project is: o Pre-Construction Meeting - December 2024 o Construction Start Date - April 2025 o Construction Completion Date - September, 2026 o Project Closeout - December 31, 2026 The method of Contractor Selection has not been Determined at this time
Conceptual
Roads / Highways
$6,600,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
July 14, 2025
December 31, 2026
Multiple Locations, Shaker Heights, OH
Related To This Project
Shaker Heights, OH
Bid Date: Jun 28 2024
Shaker Heights, OH
--
Shaker Heights, OH
--
Shaker Heights, OH
Bid Date: Jul 30 2024
Shaker Heights, OH
Bid Date: Aug 02 2024
Shaker Heights, OH
--
Shaker Heights, OH
--
Shaker Heights, OH
Bid Date: Aug 02 2024
Shaker Heights, OH
Bid Date: Jun 14 2024
Shaker Heights, OH
Bid Date: May 31 2024
Shaker Heights, OH
--
Shaker Heights, OH
Bid Date: Apr 19 2024
Shaker Heights, OH
Bid Date: Mar 29 2024
Shaker Heights, OH
Bid Date: Mar 15 2024
Shaker Heights, OH
Bid Date: Mar 22 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--