Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Santa Cruz, California. Completed plans call for the renovation of a educational facility.
The base scope of work shall focus on the Cowell Dining Hall roof, with an alternate scope of work encompassing the Stevenson Event Center roof. The project will involve providing all necessary setup, equipment, labor, and materials to install new roofing systems as specified The base scope of work shall focus on the Cowell Dining Hall roof, with an alternate scope of work encompassing the Stevenson Event Center roof. The project will involve providing all necessary setup, equipment, labor, and materials to install new roofing systems as specified. Safety measures, including building perimeter safety barriers per Cal-OSHA and all applicable standards, will be established, and safe passageways to building entrances will be provided as required by Division 1. The existing roofing, underlayment, and accessories will be removed in accordance with section 024119.13 Selective Building Demolition, including all associated flashings and metal projections. Reference to section 028300 will be made for lead remediation. The removal of existing gutters and downspouts will also be part of the scope, The work specified in section 061000 Rough Carpentry will be performed, including the replacement of damaged plywood decking as outlined in unit price #1 and the replacement of fascia if damaged fascia is discovered, as specified in unit price #2. A manufacturer-approved batten system will be installed, followed by the installation of new underlayment and a roofing system in accordance with section 073020 Concrete Roof Tiles. New gutters, downspouts, and sheet metal waterproofing will be provided in line with section 071500 Sheet Metal Waterproofing, with all sheet metal being either stainless steel or Kynar coated as specified. Sealant will be applied to the skylight as specified in section 080181 Maintenance of Glass Glazing Contractor guarantees and manufacturer warranties will be provided as specified in the listed sections. Testing and commissioning of the complete installed equipment and systems will be conducted. Special care will be taken regarding utility shutdowns and tie-ins to existing campus utilities to minimize the impact on campus operations. Additionally, attention will be given to preserving existing grades and trees, with appropriate measures implemented during construction. Overall site coordination with adjacent facilities will be maintained, ensuring continued operations in these facilities throughout all construction phases. Requests for clarification or interpretation of the Bidding Documents shall be received no later than 5:00 PM on Thursday, June 20, 2024, and addressed only to Steven Irie University of California, Santa Cruz Physical Planning. Development & Operations 1156 High Street, Ban G Santa Cruz, CA 95064 The originally signed and notarized bid form and bid bond must be received within 2 business days of the bid opening at the following address: University of California, Santa Cruz PPDO-Contracts Department 1156 High Street Santa Cruz, CA 95054 The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: License B and/or C-39 The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour as of 10/1/17) and shall comply with all applicable federal, state and local working condition requirements.
Bid Results
Educational
$704,440.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 28, 2024
July 29, 2024
Multiple Locations, Santa Cruz, CA
Related To This Project
Santa Cruz, CA
Bid Date: Jul 09 2024
Santa Cruz, CA
Bid Date: Mar 02 2021
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Jul 19 2024
Santa Cruz, CA
Bid Date: Jun 27 2024
Santa Cruz, CA
Bid Date: Aug 05 2024
Santa Cruz, CA
Bid Date: Dec 30 2020
Santa Cruz, CA
Bid Date: Aug 19 2024
Santa Cruz, CA
--
Santa Cruz, CA
--
Santa Cruz, CA
Bid Date: Aug 13 2024
Santa Cruz, CA
Bid Date: Jun 20 2024
Santa Cruz, CA
Bid Date: May 28 2024
Santa Cruz, CA
Bid Date: May 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.