Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Cincinnati, Ohio. Conceptual plans call for the renovation of a educational facility.
Final day for questions: 2:00 pm local time, July 9, 2024 Submit all questions regarding this RFQ in writing to Anthony Cowden at anthony.cowden@cincinnatistate.edu with the project number included in the subject line (no phone calls please). Project Location Clifton Campus, 3520 Central Parkway Cincinnati State request design services to upgrade the existing outdated HVAC controls in the Advanced Technology Learning Center (ATLC) and Heath Professional Building (HPB) buildings to a new building automation system (BAS) for all mechanical equipment and HVAC distribution systems and replace both boilers in the ATLC building and one boiler in the HPB building. These two buildings are located on Cincinnati State's Clifton Campus on Central Parkway. The work should be done with minimal disruption since the facilities are occupied. The ATLC building was built in 2003 and is approximately 210,000 gross square foot, consisting of classrooms, offices, learning and demonstration kitchens, restaurant and cafeteria. It currently has a legacy TAC Vista building automation system based on an obsolete early version LON protocol. The ATLC building has 7 air handlers, 13 heat recovery units for kitchen hood exhaust, 2 boilers (5000 MBH each), 4 hot water pumps, 2 chillers, 4 chilled water pumps, 2 cooling towers, 2 condenser water pumps, 2 water heaters, 1 circulation pump, 20 exhaust fans, 8 fan coil units, 17 unit heaters, 160 fan powered VAV boxes. VAV boxes and other terminal units will remain TAC Vista/XENTA and will be replaced in a future phase. Replace two existing boilers with new high-efficiency boilers and evaluate the existing pumps. The HPB building was built in 1993 and is approximately 60,000 gross square foot, consisting of classrooms, offices and lab spaces. It currently has a mix of pneumatic controls throughout the building and a SIEMENS system for the air handler and boiler. The HPB building has one air handler, 2 boilers (2000 MBH each), 2 hot water pumps, and approximately 70 VAV boxes, 8 unit heaters, fin tube radiator perimeter heat, 2 fume hood exhaust fans, and 6 exhaust fans. The project includes adding additional points to remotely view equipment that is currently not monitored, like VAV boxes and perimeter heat, converting the entire building to DDC, and eliminating the need for supplemental control air. Depending on the outcome of a current study, replace one existing boiler with a new high-efficiency boiler or tie the HPB building hot water system into the Main building hot water system. The Architect/Engineer ("A/E") will develop the Program of Requirements (POR) in collaboration with Cincinnati State as an Additional Service. The POR will serve as a performance specification for the appropriate controls vendor. Cincinnati State is requesting qualifications from A/E firms to provide design services and construction administration for the project. The A/E firm will be relied upon to source or provide commissioning services. The appropriate level of commissioning for each system or building will be determined in collaboration with the Owner. Construction Cost: $1,725,000.00 Total Project Cost: $1,900,000.00 Professional Services Start: 08 / 24 Construction Notice to Proceed: 02 / 25 Substantial Completion of all Work: 10 / 25 Professional Services Completed: 12 / 25 The method of Contractor Selection has not been Determined at this time.
Conceptual
Educational
$1,900,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2025
3520 Central Pkwy, Cincinnati, OH
Related To This Project
Cincinnati, OH
Bid Date: Jul 08 2024
Cincinnati, OH
Bid Date: Jun 28 2024
Cincinnati, OH
Bid Date: Jun 27 2024
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Jun 25 2024
Cincinnati, OH
Bid Date: Sep 26 2024
Cincinnati, OH
Bid Date: Jul 23 2024
Cincinnati, OH
Bid Date: Jun 27 2024
Cincinnati, OH
Bid Date: Jul 29 2024
Cincinnati, OH
Bid Date: Nov 25 2024
Cincinnati, OH
--
Cincinnati, OH
Bid Date: Feb 20 2019
Cincinnati, OH
Bid Date: Jun 25 2024
Cincinnati, OH
Bid Date: Aug 23 2024
Cincinnati, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.