BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2024 at 8:00 PM

Updated August 5, 2025

Site work and new construction of a playground / park / athletic field in Troutdale, Oregon. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Questions and requests for clarification related to this Work shallbe directed to the project engineer, Stuart Finney, P.E., S.E, KPFF, 111 SW FifthAve, Suite 2600 Portland, OR 97204, 503-764-0549, Stuart.Finney@kpff.com The work on the Sandy River Frontage Trail and Parks project generally consists of the following on-site work: - Construction of 225 LF elevated boardwalk with concrete piers, steel structure, and related infrastructure. - Construction of three separate public park play areas including all related site improvements (some fixtures to be owner furnished contractor installed) - Construction of 1551 LF on 12-ft wide asphalt paved multi-use trail with gravel shoulders - Construction of rock French drains and related pipe and rip rap pads. - Installation of 28 new pathway lights and all related electrical improvements. - Installation of new lighting within the elevated boardwalk. - Installation of 200 LF of new 6" storm drains and related improvements - Installation of 1145 LF of 4" sanitary sewer pipe and connection to existing mainline. - Installing of 990 LF of 2" potable waterline, meter and connection to existing mainline. - Asphalt, sidewalk, curb, and landscape restoration On-site work is to be substantially complete within ten (10) months from the notice to proceed. Questions and requests for clarification related to this Work shall be directed to the project engineer, Stuart Finney, P.E., S.E, KPFF, 111 SW Fifth Ave, Suite 2600 Portland, OR 97204, 503-764-0549, Stuart.Finney@kpff.com *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$4,217,873.00

Public - City

New Construction, Site Work

91

19

30

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
44
Bidding Soon
1,013
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

September 16, 2024

Project location map

DEPOT PARK AND 257TH WAY, Troutdale, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.