BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Burton, Michigan. Completed plans call for site work for a water / sewer project.

Work under this Contract consists of the removal and replacement of 2,015 lineal feet of existing 8-inch sanitary sewer with 15-inch PVC pipe, manhole installations, lateral service reconnections, storm sewer structure and pipe replacement and other associated improvements as shown in the Contract Drawings and described within the specifications. Question Deadline 06/25/2024 Any questions regarding the project shall be brought to the attention of Tony Tyler, PE at Stantec Consulting Michigan Inc., in writing by email at tony@tyler@stantec.com. Questions by telephone call are prohibited. Questions will not be accepted if received less than seven (7) calendar days before the bids are due. Each Proposal shall be accompanied by a cashier's check, certified check, money order or bid bond, payable to the OWNER, in an amount not less than five percent (5%) of the amount of the Proposal, as a Bid Security. The Bid Security of the Bidders under consideration will be returned after approval of the Contract by the OWNER. All others will be returned after the Proposal opening. The successful Bidder will be required to furnish a satisfactory Performance Bond and Labor and Material Bond, each in the amount of One Hundred Percent (100%) of the Contract. Withdrawal of any Proposal is prohibited for a period of 90 days after the actual date of the opening thereof. The OWNER reserves the right to accept any Proposal, to reject any or all Proposals, and to waive any irregularities in any Proposal, in the interest of the OWNER. Bidders shall not discriminate against any employees or firm due to origin, race, age, or physical conditions. CONTRACTOR shall be an equal opportunity employer. The Bidder is advised that to submit a bid on this project, the Bidder shall purchase a set of Plans and Specifications from the ENGINEER and be a registered Plan Holder. Work under this Agreement shall be commenced upon receipt of Notice to Proceed, and the entire work shall be completed within 90 calendar days.

Award

Water / Sewer

$1,552,726.00

Public - City

Site Work

15

12

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
74
Bidding Soon
1,337
All Active Projects
539
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

August 1, 2024

img_map_placeholder

S Center Rd, Burton, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.