Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 22, 2024 at 8:00 PM
Updated July 23, 2024
Site work for a water / sewer project in Burton, Michigan. Completed plans call for site work for a water / sewer project.
Work under this Contract consists of the removal and replacement of 2,015 lineal feet of existing 8-inch sanitary sewer with 15-inch PVC pipe, manhole installations, lateral service reconnections, storm sewer structure and pipe replacement and other associated improvements as shown in the Contract Drawings and described within the specifications. Question Deadline 06/25/2024 Any questions regarding the project shall be brought to the attention of Tony Tyler, PE at Stantec Consulting Michigan Inc., in writing by email at tony@tyler@stantec.com. Questions by telephone call are prohibited. Questions will not be accepted if received less than seven (7) calendar days before the bids are due. Each Proposal shall be accompanied by a cashier's check, certified check, money order or bid bond, payable to the OWNER, in an amount not less than five percent (5%) of the amount of the Proposal, as a Bid Security. The Bid Security of the Bidders under consideration will be returned after approval of the Contract by the OWNER. All others will be returned after the Proposal opening. The successful Bidder will be required to furnish a satisfactory Performance Bond and Labor and Material Bond, each in the amount of One Hundred Percent (100%) of the Contract. Withdrawal of any Proposal is prohibited for a period of 90 days after the actual date of the opening thereof. The OWNER reserves the right to accept any Proposal, to reject any or all Proposals, and to waive any irregularities in any Proposal, in the interest of the OWNER. Bidders shall not discriminate against any employees or firm due to origin, race, age, or physical conditions. CONTRACTOR shall be an equal opportunity employer. The Bidder is advised that to submit a bid on this project, the Bidder shall purchase a set of Plans and Specifications from the ENGINEER and be a registered Plan Holder. Work under this Agreement shall be commenced upon receipt of Notice to Proceed, and the entire work shall be completed within 90 calendar days.
Award
Water / Sewer
$1,552,726.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
