Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Miramar, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Counties: Broward Road Name: SR-823/flamingo From Pembroke Road to S of SR-820/pines Blvd Limits: 86190000 Project(s): 44768015201(*) Federal Aid No: N/A Project(s): 44768015202 Federal Aid No: N/A Total Roadway Length: 4.462 Miles Contract Days: 196 Total Bridge Length: 0.000 Miles Total Proposal Length: 4.462 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time:120 Please Read the Full Advertisement Description: The Improvements under this Contract consist of, but are not limited to, MOT (standard, special detour, traffic control officer, barricade, barrier, channelizing, arrow board PCMS, signalization and maintenance, detection and maintenance), protections (sediment barrier, turbidity barrier, inlet protection), monitor existing structures (inspection, settlement), earthwork (excavation, embankment), aluminum (handrail/guiderail), concrete (removal, curb and gutter, sidewalk, driveways, gravity wall), asphalt (milling, resurfacing, miscellaneous), guardrail (general, remove, end treatment), pavement markings (detectable warnings, painted, thermoplastic, bike lane), signing (single column, internally-illuminated, reflective sign strip, tubular marker, object marker, RPM, remove), traffic monitoring site (sensor, loop, cabinet F&I, cabinet remove), lighting (pole complete, pole remove, cable distribution system, conductors), signalization (pole, pole remove, vehicular signal F&I/remove/auxiliaries, vehicular detection, pedestrian signal, pedestrian detection, strain pole remove, mast arm F&I, mast arm remove, preemption system, controller, field ethernet, wireless communication), pull/splice box, conduit, junction box, drainage (inlets, pipe culvert), utilities adjustments (manhole, valve box), electrical (power service, service wire, service disconnect, load center, UPS), and sod along State Road 823 (Flamingo Road) from Pembroke Road to State Road 820 (Pines Boulevard), for 1.120 miles, in the Cities of Miramar and Pembroke Pines, Broward County. Pre-qualified: Contractor Must Be Pre-qualified. Performance Bond: A Contract / Performance Bond is Required for This Project. Question Deadline 07/05/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 Resurfacing - SR-823
Award
Roads / Highways
$3,165,008.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2024
September 10, 2024
FL-823, Miramar, FL
Related To This Project
Miramar, FL
Bid Date: Aug 05 2024
Miramar, FL
Bid Date: Aug 01 2024
Miramar, FL
Bid Date: Nov 04 2024
Miramar, FL
--
Miramar, FL
Bid Date: Aug 15 2024
Miramar, FL
Bid Date: Sep 19 2024
Miramar, FL
Bid Date: Sep 18 2024
Miramar, FL
Bid Date: Oct 09 2024
Miramar, FL
Bid Date: Sep 12 2024
Miramar, FL
Bid Date: May 29 2024
Miramar, FL
Bid Date: Jun 11 2024
Miramar, FL
Bid Date: May 15 2024
Miramar, FL
Bid Date: Jun 03 2024
Miramar, FL
Bid Date: May 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.