Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 11, 2024 at 8:00 PM
Updated July 13, 2024
Demolition, site work and renovation of a civil project in Beverly, Massachusetts. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.
Work will take place in Beverly, Wenham and Danvers at Board's Water Filtration Plant, Longham Reservoir Gatehouse, and Putnamville Reservoir Gatehouse. Work includes immediate needs upgrades: demolish Putnamville Reservoir gatehouse; replace Longham Gatehouse bar rack and install flow meter along pipeline; upgrade filters including replacement of the underdrains, troughs, surface wash equipment and media; improvements to filter pipe gallery such as painting and select pipe replacement; install new backwash drain line valve; replace select parts in sedimentation basin; updates to the fluoride room including new tanks and pumps with adequate containment; all appurtenant and related work. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. CONTRACT NO. 2022-1: FACILITES UPGRADES The work will take place at the following locations: Board's Water Filtration Plant, 50 Arlington Avenue, Beverly, MA; Longham Reservoir Gatehouse, Longham Road, Beverly, MA; and Putnamville Reservoir Gatehouse, 320 Locust Street, Danvers, MA. The work includes, but is not limited to the following immediate needs upgrades and all appurtenant and related work, all as more particularly indicated, shown or described in the Contract Documents: Demolition of the above grade gatehouse at Putnamville Reservoir; Replacement of bar rack at Longham Gatehouse and installation of a flow meter along the pipeline; Upgrade of filters including replacement of the underdrains, troughs, surface wash equipment, and media; Improvements to filter pipe gallery such as painting and select pipe replacement; Installation of new backwash drain line valve; Replacement of select parts in the sedimentation basin; Updates to the fluoride room including new tanks and pumps with adequate containment; and All appurtenant and related work, all as more particularly indicated, shown or described in the Contract Documents. The Contract Time is 900 consecutive calendar days. The estimated project cost is $8,500,000.
Post-Bid
Water / Sewer
$8,500,000.00
Public - City
Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2024
September 10, 2024
Multiple Locations, Beverly, MA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
