BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a civil project in Beverly, Massachusetts. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Work will take place in Beverly, Wenham and Danvers at Board's Water Filtration Plant, Longham Reservoir Gatehouse, and Putnamville Reservoir Gatehouse. Work includes immediate needs upgrades: demolish Putnamville Reservoir gatehouse; replace Longham Gatehouse bar rack and install flow meter along pipeline; upgrade filters including replacement of the underdrains, troughs, surface wash equipment and media; improvements to filter pipe gallery such as painting and select pipe replacement; install new backwash drain line valve; replace select parts in sedimentation basin; updates to the fluoride room including new tanks and pumps with adequate containment; all appurtenant and related work. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. CONTRACT NO. 2022-1: FACILITES UPGRADES The work will take place at the following locations: Board's Water Filtration Plant, 50 Arlington Avenue, Beverly, MA; Longham Reservoir Gatehouse, Longham Road, Beverly, MA; and Putnamville Reservoir Gatehouse, 320 Locust Street, Danvers, MA. The work includes, but is not limited to the following immediate needs upgrades and all appurtenant and related work, all as more particularly indicated, shown or described in the Contract Documents: Demolition of the above grade gatehouse at Putnamville Reservoir; Replacement of bar rack at Longham Gatehouse and installation of a flow meter along the pipeline; Upgrade of filters including replacement of the underdrains, troughs, surface wash equipment, and media; Improvements to filter pipe gallery such as painting and select pipe replacement; Installation of new backwash drain line valve; Replacement of select parts in the sedimentation basin; Updates to the fluoride room including new tanks and pumps with adequate containment; and All appurtenant and related work, all as more particularly indicated, shown or described in the Contract Documents. The Contract Time is 900 consecutive calendar days. The estimated project cost is $8,500,000.

Post-Bid

Water / Sewer

$8,500,000.00

Public - City

Demolition, Renovation, Site Work

98

29

8

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
126
Bidding Soon
2,466
All Active Projects
1,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2024

September 10, 2024

img_map_placeholder

Multiple Locations, Beverly, MA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.