BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2024 at 8:00 PM

Updated August 20, 2024

Site work for a municipal facility in Hastings, Minnesota. Completed plans call for site work for a municipal facility.

REQUIRED SERVICES A. Removal and replacement of existing irrigation controllers with Hunter HCC Smart controllers, including testing of system functions so that all zones and heads are functioning as designed. Work is to be completed by Friday August 30th or after with approval from the site supervisor. B. Installation of new Hunter HC Wireless Flow Meter on all main outflow water lines to each irrigation system. Water mains vary in diameter from 1 1/2 " to 2" by controller location. Must have wireless compatibility with Hydrawise controllers. Dakota County will furnish landscape and irrigation drawings for locations where and when available. It will be the contractor's responsibility to coordinate and maintain the irrigation layout with the site supervisor where drawings are not available. INSPECTION OF LOCATIONS Before submitting a quote, quoters shall be held to examine all the locations specified herein where work is to be performed, and become satisfied as to the existing conditions under which a contractor will be obliged to operate, that may affect the work under this contract. No allowances shall be made in this connection on behalf of the quoter and/or contract, for any negligence on their part. For a pre quote site visit contact Randy Cunningham, Grounds Maintenance Supervisor, at randy.cunningham@co.dakota.mn.us or 651-480-1251. CONTRACTOR TO FURNISH A. All transportation B. All equipment and necessary supplies to complete the work described in this scope of services. The contractor shall furnish, operate, and maintain, suitable and adequate equipment necessary to perform all tasks described in bid item, in a favorable manner. The equipment furnished by the contractor must be in good repair. Equipment and supplies may not be stored overnight or for extended periods of time on Dakota County property unless approved by the site supervisor. SAFETY EQUIPMENT, PROPER CLOTHING, AND APPEARANCE All personnel working on grounds shall be responsible for wearing safety equipment per O.S.H.A. requirements. All personnel shall maintain a clean and neat appearance. QUOTES One quote is requested for Northern Service Center, Hastings Administration Center, Juvenile Services Center, and Western Service Center - Six (6) Controllers and associated flow meters in total. The quote is to be based upon the attached project scope, specifications and requirements.

Award

Municipal

$12,100.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
137
Bidding Soon
1,579
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

Project location map

Multiple Locations, Hastings, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.