BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 18, 2025

Site work and outdoor lighting for a civil project in North River, North Dakota. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Goals for Minority Participation in Each Trade by County 0.7% Goals for Female Participation in Each Trade 6.9% Project No. 23644 Proposed Work Consists of 0.0000 Miles of Signal, Turn Lane, Lighting, Pavement Marking Modifications Located Intersections of 9th St E & 19th Ave E, 32nd Ave E & 4th St E and Sheyenne St & 38th Ave W - West Fargo And Involves Approximately 1 L Sum Contract Bond; 587 Sy Removal of Concrete Pavement; 1558 Lf Removal of Curb & Gutter; 432 Cy Common Excavationwaste; 262 Cy Aggregate Base Course Cl 5; 84 Ton Commercial Grade Hot Mix Asphalt; 172 Sy 8in Non-reinf Concrete Pvmt Cl Aedoweled; 644 Sy 10in Non Reinf Concrete Pvmt Cl Ae-doweled; 1 L Sum Mobilization; 934 Unit Traffic Control Signs; 12 Ea Type Iii Barricade; 4 Ea Sidewalk Barricade; 145 Ea Delineator Drums; 333 Sf Obliteration of Pavement Marking; 10 Ea Inlet Protectionspecial; 1000 Sy Geosynthetic Material Type R1; 42 Sy Concrete Median Nose Paving; 75 Sf Flat Sheet for Signs-type Xi Refl Sheeting; 4 Ea Reset Delineator; 3 Ea Reset Sign Panel; 2 Ea Reset Sign Support; 2044 Lf Epoxy Pvmt Mk 4in Line-grooved; 1816 Lf Epoxy Pvmt Mk 8in Line-grooved; 132 Lf Epoxy Pvmt Mk 24in Line-grooved; 112 Sf Epoxy Pvmt Mk Message-grooved; 1 L Sum Lighting System (Roadway); 1 Ea Traffic Signal System - Site 1; 1 Ea Traffic Signal System - Site 2; 1 Ea Traffic Signal System - Site 3. Time September 11, 2026 Bid Range $400,001 to $600,000 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. Contractor's License--A contractor is not required to have a license from the state of North Dakota before bidding on any project, however, no contract will be awarded unless said contractor holds a current North Dakota license in the class within which the value of the contract falls. Contractors are required to meet the provisions of the Contract Work Hours and Safety Standards Act on the federal aid projects, are required to meet the Fair Labor Standards Act on all projects, and are required to pay any minimum wage rates set forth in the proposal form. A bid guarantee is required by Section 24-02-20, NDCC. The bid guarantee may be a bid bond equal to 10 percent of the full amount of the bid or a cashier's check of the bidder on a solvent bank equal to 5 percent of the bid. Bid bond shall be on the department form SFN 14196. Prior arrangements may be made with the department to file bid guarantees in advance. The Department of Transportation and all bidders are obligated to affirmatively ensure that in any contract entered into pursuant to this advertisement, minority or women's business enterprises will be afforded a full opportunity to participate and to submit bids in response to this invitation and will not be discriminated against on the grounds of race, religion, color, sex, age, or national origin in consideration for an award. Where applicable the contractor must fulfill all special provision requirements for utilization of Disadvantaged Business Enterprises. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - Job No 24052 - Signal, Turn Lane, Lighting, Pavement Marking Modifications *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$656,717.00

Public - State/Provincial

Outdoor Lighting, Site Work

67

4

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
17
Bidding Soon
254
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2025

December 15, 2025

Project location map

CENTENNIAL ROAD and JERICHO ROAD, North River, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.