BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a mixed-use development in North River, North Dakota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project is part of the City's annual infrastructure improvement efforts and impacts multiple areas of Fargo each construction season. The purpose of the project is to correct deficiencies on the streets that have developed over time. As part of the project, the Contractor will be mud-jacking sections of the curb and gutter in an effort to alleviate major drainage problems. This process involves coring small holes through the curb and gutter section (and driveway apron when necessary) and injecting grout through holes to raise the gutter to the desired grade. The Contractor will replace areas of broken up pavement as well as a limited amount of curb & gutter. The Contractor will also be replacing some sections of sidewalk that need to be updated to meet new standards for the Americans with Disabilities Act. After all the concrete work has been completed the Contractor will mill off some of the asphalt and put on a new lift of asphalt. The project will take place in four different areas. This project is needed to correct deficiencies on the streets that have developed over time. By milling and overlaying the roads at this time, we can extend the life of the road and get a better riding street with improved drainage. Substantial Completion Date: September 25, 2026 Final Completion Date: October 25, 2026 The estimated cost of construction is $1,884,682.00. The project shall proceed in the following order: A. Mud jack curb and gutter (Engineer will mark out areas to be mud jacked). B. Remove and replace curb and gutter, inlet repairs and driveways where marked. C. Install or replace ADA Ramps and sidewalk. D. Replace manhole castings as marked in the field. E. Milling of street sections and patching. F. Level all sections where required by the Engineer where overlay exceeds lift depth by 3/4 inch. G. Install detector loops. Engineer will mark locations. H. Pave asphalt overlay. Adjust all manholes and gate valve boxes as you pave. I. Clean manholes/inlets, and gate valve boxes. J. Install all pavement markings. K. Attend to any remaining clean-up items.

Bid Results

Roads / Highways

$1,864,164.00

Public - City

Paving, Site Work

75

7

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
19
Bidding Soon
198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2026

July 6, 2026

Project location map

Multiple Locations, North River, ND


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.