EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 22, 2024 at 8:00 PM

Updated July 23, 2024

Demolition, site work, renovation and addition to a water / sewer project in Ashland, Kentucky. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Ashland WRRF Expansion and Improvements Turbocompressor System and Controls This Process Allows Buyer to: 1. Select the Vendor Such That Final Design Can Be Completed Around One Vendor as Each Vendor's Equipment Offers Differing Installation Requirements for Piping, Electrical, Control, Mounting, Dimensions for Structures, Etc., Thus Providing the Construction Contractor With a Better Defined Project Equating to a More Competitive Bid for Buyer. 2. Establish Fixed and Known Cost of the Equipment Through Competitive Proposal. 3. Establish an Agreement With a Vendor That Will Start During Design and Last Though the Warranty Period. 4. Provide a Mechanism to Authorize a Vendor to Begin Working With Buyer and Its Engineer to Provide Shop Drawings and Assistance During Design. Provide Vendor an Opportunity to Work Closely With the Construction Contract Bidders During the Bid Process to Provide a Clear Understanding of the Equipment Being Provided and the Installation Requirements. 5. Having Shop Drawings, Submittal, and Equipment Specifications Completed in Parallel to Bidding the Construction Project Will Reduce Lead Times of Equipment Delivery. 6. Establish Future Maintenance and Operating Cost for a Given Time Period So That Buyer May Better Forecast Expenses. The Bid Must Be Accompanied by Bid Security Made Payable to Buyer in an Amount of 5% of the Bidder's Maximum Bid Price. The City of Ashland Reserves the Right to Reject Any or All Bids, To Waive Any Technicality, and to Accept Any Bid Which It Deems Advantageous. All Bids Shall Remain Subject to Acceptance for 90 Days After the Time Set for Receiving Bids. Bidder's Attention is Called to the Fact That Any Contract Awarded Under This Advertisement is Expected to Be Funded in Part by A Loan From the Kentucky Infrastructure Authority (Kia) State Revolving Fund (Srf). Bidders Shall Comply With the Supplemental General Conditions Of the Clean Water Srf, Drinking Water Srf (Water and Wastewater). This Contract May Also Be Fi Nanced With Assistance From the American Rescue Plan Act (Arpa) and is Subject to All Applicable Federal and State Laws and Regulations. Bidders and Its Subcontractors Shall Comply With 41 Cfr 60-4, In Regard to Affirmative Action, to Ensure Equal Opportunity to Females and Minorities and Will Apply the Timetables and Goals Set Forth in 41 Cfr 60-4, if Applicable to the Area of the Project. Bidder Shall Make Positive Eff Orts to Use Small, Minority, Women-owned, and Disadvantaged Businesses.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
48
Bidding Soon
397
All Active Projects
181
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2024

August 19, 2024

img_map_placeholder

To Be Determined, Ashland, KY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.