BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Wisc Dells, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

SSD 15C29-08a Question Deadline 06/26/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Raine Gardner, PE, rgardner@msa-ps.com or Owen Mattila at omattila@msa-ps.com. Questions received less than seven days prior to the date for opening of Bids may not be answered. The Project includes the following Work: Full Depth Milling and removal of asphalt pavement and repaving of East Adams Street and Progressive Drive Full Depth milling and pulverize of asphalt pavement and repaving of Elizabeth Road, Winnebago Lane, and Redbird Avenue. Roadways will be widened as well as new gravel shoulders for the rural section roadways. Recompact and repave bridge roadway approaches in asphalt pavement to the Dell Creek Bridge on Burritt Avenue. Other work includes erosion control, traffic control, pavement markings, base course, concrete sidewalk and curb and gutter, limestone gravel shoulders, and final turf/site restoration. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. The anticipated substantial completion date is November 8, 2024 and final completion date is November 22, 2024. Location Details Site Address: Lake Delton City: Village of Lake Delton County: Sauk County State/Province: WI

Award

Roads / Highways

$1,154,668.00

Public - City

Paving, Site Work

50

17

2

8

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
29
Bidding Soon
488
All Active Projects
195
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2024

July 29, 2024

img_map_placeholder

Multiple Locations, Wisc Dells, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.