BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Binghamton, New York. Completed plans call for the renovation of a residential development.

CR Number: 2110990 The project consists of the removal of aluminum storefront, glazing, and concrete masonry units as indicated on the drawings. New work consists of the construction of a 2- hour fire barrier with 1-1/2-hour rated double egress doors. Doors will be on magnetic hold opens with connection to the fire alarm system. Hardware is specified so that the doors can have a card access added in the future. Areas where the storefront has been removed will be infilled with concrete masonry units to match existing adjacent surfaces. There will be patching to match existing quarry tile flooring and base. Two new doors will be added to the exterior wall. DESCRIPTION: 1NA Egress Door Installation.The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to this scope of work and architectural drawings if supplied. Upon completion of 1NA Egress Door Installation., before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the Maintenance Supervisor. SCOPE OF WORK: 1. Create new egress door in the 1-2 Pedestrian way, front. Per attached drawings. 2. Contractor will provide all work to create the new egress including all masonry, carpentry, electrical, emergency egress signage, door, door frame and panic hardware, exterior site work and tie into existing foot paths/blacktop. 3. A 3’ long x 6’ wide concrete exterior door apron shall be underpinned to the existing/newly modified slab under the new doorway to a depth of 6” and install #4 rebar 10” apart underthe doorway beginning & ending minimum 4” outside of the new doorway +/-. Rebar shall extend 6” into the new apron slab. 4. New door apron shall be 5000psi air entrained concrete 4” thick with 6x6 – w2.9xw2.9 wwf (placed & held mid-slab by use of 2” reinforcement spacers). Subgrade shall be compacted with 8” minimum compacted subbase Course A1 Aggregate. See detail below. 5. New concrete apron shall be sealed with waterproof mastic at building edges and existing walkway material. 6. Existing walkway material shall be clean cut to allow new apron to abut it smoothly. 7. New dark bronze exterior door, frame and hardware shall conform to the specification in the attached Project Manual. 8. Dark bronze hardware set: Qty. 3 Butt Hinge (Stanley FBB191) and Qty. 1 Panic Device with Lever Corbin Russwin ED5200, (Storeroom function, Entrance by lever only when released by key. Key removeable only when locked). Lock Shall accept a Schlage Small Format International Replaceable Core Cylinder. OPWDD will provide the lock cylinder. 9. Door hardware shall latch into a strike pocket in the new door frame. Facility: Broome DDSOO Main Campus Facility Address: 249 Glenwood Rd, Binghamton NY 13905 Point of Contact: Dan Blair Maintenance Supervisor Contact Phone Number: 607-793-7071 Project Title: 1NA Egress Door Installation Summary of Work: Create new egress door in the 1-2 Pedestrian way, front. 10. Contractor shall warrantee work for a period of one year from date of payment for job. Warrantee shall be for parts and labor. 11. Work shall conform to all applicable codes, be done according to manufacturer’s instructions, and follow industry best practices. The project consists of the removal of aluminum storefront, glazing, and concrete masonry units as indicated on the drawings. New work consists of the construction of a 2- hour fire barrier with 1-1/2-hour rated double egress doors. Doors will be on magnetic hold opens with connection to the fire alarm system. Hardware is specified so that the doors can have a card access added in the future. Areas where the storefront has been removed will be infilled with concrete masonry units to match existing adjacent surfaces. There will be patching to match existing quarry tile flooring and base. Two new doors will be added to the exterior wall.

Award

Residential Subdivision

$18,800.00

Public - State/Provincial

Renovation

6

19

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
68
Bidding Soon
848
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 12, 2024

img_map_placeholder

249 Glenwood Rd, Binghamton, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.