BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Cincinnati, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Porch and Sidewalk Replacement at 619 Oak Avenue Construction Time is 45 calendar days from date stated in the ''Notice to Proceed''. The Prevailing Wages shall be paid for a legal day’s work to laborers, workmen or mechanics engaged in work under this Contract, at the site of the Project, in the trade or occupation listed. Certified payrolls are to be submitted WEEKLY. Failure to do so may hold up payments. The contractor agrees to make its best effort to expend at least 20% of the total dollar amount of the Contract on Minority Business Enterprises (MBE), an entity with at least 51% ownership interest by a minority in business), and at least 5% of the Contract to a Women Business Enterprises (WBE), an entity with a least 51% ownership interest by a woman in business. SCOPE OF WORK Scope of Work Rev 5/24 1. Remove and replace porch concrete slab, posts, railings, steps per drawings and specifications 2. Remove and replace sidewalks per drawings per Drawings and Specifications 3. Comply and Pay permit fee of $161.60 issued for 619 Oak Ave. work by City of Wyoming customerservice@wyomingohio.gov

Award

Sidewalks / Parking Lot

$34,800,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
76
Bidding Soon
1,420
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 29, 2024

img_map_placeholder

619 Oak St, Cincinnati, OH


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.