Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 27, 2025 at 8:00 PM
Updated October 31, 2025
Site work for a water / sewer project in Draper, Utah. Completed plans call for site work for a water / sewer project.
is solicitation is Stage II: Invitation to Bid of a multistage selection process for construction services. Only Contractors short listed by the Selection Committee during the Stage I: Request for Proposals process for this project are invited to bid during this stage of the selection process. Project Description:The Point of the Mountain State Land Agency (POMSLA) is in the process of redeveloping the old correctional facility site located in Draper, Utah. As part of this work a 3-million gallon culinary water storage tank will be constructed on the east side of I-15 adjacent to the existing Department of Corrections Administration Building. The work will include demolition of 2 existing concrete tanks, excavation of the tank site, metering vaults, apprentice waterlines 16" and 30" to feed and distribute water to The Point development. The work also includes inlet and outlet vault structures, metering vault structure, approximately 1,300 linear feet of 30" and 12" ductile iron piping, SCADA, yard piping and restoration of existing sidewalks, roadways etc. that will be disturbed during construction. Substantial Completion Prior To: June 30, 2027 Liquidated Damages: $7,500 per day Construction Cost Estimate: $7,908,956.34
Award
Water / Sewer
$9,914,250.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2025
December 19, 2025
14717 Minuteman Dr, Draper, UT
Related To This Project
Draper, UT
Bid Date: Jun 27 2024
Draper, UT
--
Draper, UT
Bid Date: Jul 03 2024
Draper, UT
--
Draper, UT
Bid Date: Aug 22 2024
Draper, UT
Bid Date: Oct 23 2024
Draper, UT
Bid Date: Sep 17 2024
Draper, UT
--
Draper, UT
Bid Date: Jun 14 2024
Draper, UT
Bid Date: May 20 2024
Draper, UT
--
Draper, UT
--
Draper, UT
Bid Date: Apr 23 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
