Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 27, 2024 at 8:00 PM
Updated July 27, 2024
Site work and paving for a mixed-use development in Shiprock, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
SCOPE OF WORK Final Design 1. Complete a final design for paving Access Road, Office Parking Lot and Warehouse Parking Lot. The design will include proper drainage, safety features such as striping for parking spaces, handicap parking and loading/unloading zones. The final design will involve 30%, 60%, and 90% reviews, specifications and a stamped final design by a licensed Professional Engineer in the State of New Mexico. 2. Identified areas requiring paving is attached. 3. Contractor will be responsible for assessing the identified areas and completing the final design. 4. Perform project and budget management for the duration of the project including surveying and any required testing. The Navajo Nation reserves the right to reject any and all proposals and may elect to award the contract not solely on the bid amount but the bidders qualification If there are any questions regarding this Request for Proposal call Lorita Etsitty at(928) 871-6317 or Francis Johnson at (928) 206-7126 SCOPE OF WORK Final Design 1. Complete a final design for paving Access Road, Office Parking Lot and Warehouse Parking Lot. The design will include proper drainage, safety features such as striping for parking spaces, handicap parking and loading/unloading zones. The final design will involve 30%, 60%, and 90% reviews, specifications and a stamped final design by a licensed Professional Engineer in the State of New Mexico. 2. Identified areas requiring paving is attached. 3. Contractor will be responsible for assessing the identified areas and completing the final design. 4. Perform project and budget management for the duration of the project including surveying and any required testing.
Post-Bid
Roads / Highways
$400,000.00
Public - Federal
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 26, 2024
August 26, 2024
To Be Determined, Shiprock, NM
Related To This Project
Shiprock, NM
Bid Date: Oct 21 2024
Shiprock, NM
Bid Date: Aug 13 2024
Shiprock, NM
Bid Date: Nov 07 2024
Shiprock, NM
Bid Date: Dec 12 2024
Shiprock, NM
--
Shiprock, NM
--
Shiprock, NM
Bid Date: Jan 31 2025
Shiprock, NM
Bid Date: Mar 06 2025
Shiprock, NM
Bid Date: Jun 26 2024
Shiprock, NM
Bid Date: Aug 16 2024
Shiprock, NM
Bid Date: Apr 15 2024
Shiprock, NM
Bid Date: Mar 28 2024
Shiprock, NM
Bid Date: Apr 01 2024
Shiprock, NM
Bid Date: Mar 21 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
