Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Downers Grove, Illinois. Completed plans call for the renovation of a 45,600-square-foot municipal facility.
Electronic submissions for the above numbered contract as described below will be received by the Illinois Tollway via BidBuy, the State of Illinois eProcurement System, until 10:30:00 a.m. local time on October 22, 2024. The Illinois State Tollway Highway Authority (ISTHA) will no longer accept manual, hard copy bid submissions. All bidders are strongly encouraged to submit bids timely as the system will not accept late bid submittals The work to be done under this contract shall be started on or about January 21, 2025. All work under this contract shall be completed by July 15, 2025. The location of services to be performed is the Veterans Memorial Tollway (I-355) at Mile Post 22.0 in DuPage County, Illinois. The scope of the work shall consist of, but is not limited to, roofing and roofing accessories, plumbing, mechanical, and electrical as required for the reroof, and all other appurtenant and miscellaneous construction shown on the plans and as required by the Standard Specifications and within these special provisions. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 9240D.9298_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on October 1, 2024. A completed Questionnaire and a statement of current contractual obligations on forms supplied by the Illinois Tollway will be required from the apparent low bidder once the apparent low bidder is determined. Each bid must be accompanied by a Bid Guaranty in the amount of five (5%) percent of the total amount shown in the bid for the contract. The Bid Guaranty shall be in the form of an acceptable bid bond or a bank draft, certified check or cashier's check drawn on a solvent bank made payable to the Illinois State Toll Highway Authority Contract Bond Agreement T-1 thru T-5 Performance Bond U-1, U-2 Payment Bond V-1, V-2 Insurance I-5 The EEO goals set by the U.S. Dept. of Labor - Office of Federal Contract Compliance Programs ("OFCCP") for construction trade workers in the Chicago area, which is provided through Executive Order 11246, apply to this contract. The EEO goals are measured through the following percentages of construction aggregated work hours in each of the categories; Women: at least 6.9 percent for all contracts. Minorities: set on a contract basis, dependent upon the county where the work will be performed. The Minority Goal for this contract is 19.6%. ILLINOIS COUNTY CURRENT FEDERAL GOAL % FOR MINORITIES ILLINOIS COUNTY CURRENT FEDERAL GOAL % FOR MINORITIES BOONE 6.3 LAKE 19.6 BUREAU 18.4 LASALLE 18.4 COOK 19.6 LEE 4.6 DEKALB 18.4 MCHENRY 19.6 DUPAGE 19.6 OGLE 4.6 GRUNDY 18.4 ROCK ISLAND 4.6 HENRY 4.6 STEPHENSON 4.6 IROQUOIS 18.4 WHITESIDE 3.4 KANE 19.6 WILL 19.6 KENDALL 18.4 WINNEBAGO 6.3
Post-Bid
Municipal
$100,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 22, 2024
January 21, 2025
3450 Finley Rd, Downers Grove, IL
Related To This Project
Downers Grove, IL
Bid Date: Jun 26 2024
Downers Grove, IL
--
Downers Grove, IL
Bid Date: Jul 17 2024
Downers Grove, IL
--
Downers Grove, IL
Bid Date: Jul 10 2024
Downers Grove, IL
Bid Date: Jul 24 2024
Downers Grove, IL
Bid Date: Aug 01 2024
Downers Grove, IL
Bid Date: Aug 14 2024
Downers Grove, IL
Bid Date: Jul 09 2024
Downers Grove, IL
Bid Date: Jul 11 2024
Downers Grove, IL
Bid Date: Jul 24 2024
Downers Grove, IL
Bid Date: Jul 11 2024
Downers Grove, IL
Bid Date: Jun 26 2024
Downers Grove, IL
Bid Date: Jun 20 2024
Downers Grove, IL
Bid Date: Jun 19 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.