BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, remodeling and renovation of a military facility in Silverdale, Washington. Completed plans call for the remodel of a military facility.

Remove and replace entire existing roofs, roof insulation, fascia, soffits, gutters, downspouts roof hatches and associated trims/fasteners on B7415, 7419, 7425 and 7428. Work on B7415, B7419 and B7425 to include Logistic Escape Trunk (LET) roof hatches, integrated hand railings and their electrical motors and actuators. Install snow guard systems to B7125 and B7142. Coordinate with ET prior to commencement of work. 2. All work elements described below apply to all four (7415, 7419, 7425, 7428) unless otherwise specified. 3. Submit and gain approval for all required outages and closures/disruptions prior to starting work on each building. 4. Receive all materials per building prior to starting roof tear off to minimize risk of interruption of work and impact to customer critical mission. 5. Provide overhead safety protection for building occupants to allow for the roofing work with minimal disruption to 24hour work cycle inside. 6. Contractor is responsible to provide weather protection for the interior of the buildings and the building contents during construction. The building contents will not be emptied during construction. 7. Selective demolition of existing roofing and roofing insulation. Includes personnel and roll up door area roof overhang roofs and trims. 8. Selective demolition of existing gutters and down spouts Install new personnel and roll up door area overhang roofs and associated flashings and trims. 14. Install new roofing insulation to meet R38 standard. 15. Install new rooftop walking surfaces for areas of access around LET hatches. 16. Install new roof hatches, hatch operation motor/mechanisms (B7425 is only building with motorized hatches, B7415 and B7419 have manually opening hatch mechanisms) and associated hatch hand railing systems. Each B7425 hatch motor to also include new weatherproof switch and enclosure and associated conduit and wiring to replace existing. The B7425 interior electrical assemblies/components for the hatches are to be re-used. New hatch exterior assemblies/components to integrate with the existing interior hatch electrical assemblies without modification. 17. Install new roof gutters and down spouts with splash blocks unless exiting into existing piping. 18. Install snow guard system to B7125 (600LF) and to B7142 (100LF). 19. Upon completion of the work, the Contractor shall inform the ET to demonstrate operational tests .

Post-Bid

Military

$1,000,000.00

Public - Federal

Demolition, Remodeling, Renovation

14

6

21

2

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
33
Bidding Soon
902
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

September 9, 2024

img_map_placeholder

To Be Determined, Silverdale, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.