BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Carson City, Nevada. Completed plans call for site work for a water / sewer project.

Summary: The Southeast Sewer Conversion Project - is a Federally Funded project. Carson City is accepting sealed bids for all labor, materials, equipment, and incidentals necessary for the Southeast Mandatory Sewer Extension Project Phase 9A. The project includes the installation of sewer mains and laterals for the residents located within Phases 9 and 10 of the City Master Plan. Bids must be submitted in accordance with the bid documents, drawings and plans, specifications, and special conditions related hereto. Engineers Estimate: $ 2,800,000 No Pre-Bid meeting Question Deadline 07/12/2024 at 5:00 PM PT This Section covers the construction methods involved in the clearing and grubbing operation when working near existing trees. 2. LIMIT OF WORK Limit of work shall conform to the Standard Specifications for Public Works Construction Section 300. 3. SCOPE Scope of work shall conform to the Standard Specifications for Public Works Construction Section 300. 4. WORK OUTSIDE STATED LIMITS No payment will be made to the Contractor for clearing and grubbing outside the stated limits unless such work is authorized by the City. All surface improvements and landscaped areas that are damaged by actions of the Contractor shall be restored to their original condition at the Contractor's expense. 5. ROOT MITIGATION When working within the drip line of a tree, or within 1 foot per inch of diameter of the tree trunk (Example: within 12 feet of a 12" diameter tree), the contractor shall notify the Construction Manager three (3) days prior to excavation. All tree root mitigation work shall be performed under the supervision of: Carson City Parks and Recreation representative, a Carson City Arborist, or an ISA qualified contractor. If the tree roots need pruning, the Parks and Recreation representative will direct the work.

Bid Results

Water / Sewer

$2,222,222.00

Public - City

Site Work

31

12

13

2

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
13
Bidding Soon
242
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

September 19, 2024

img_map_placeholder

Multiple Locations, Carson City, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.