BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2024 at 8:00 PM

Updated August 21, 2024

Site work and paving for a bridge / tunnel in Tillamook, Oregon. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project consists of installing a temporary 52-ft long concrete bridge over an existing 20-ft bridge which will remain in place. Minor approach work is required on the gravel road. Tillamook County will furnish PCPS slab and bridge rails. The engineer's estimate is between Zero Dollars ($0) and Eighty-Two Thousand Dollars ($82,000). Each prospective contractor must provide full company name, address, contact name, phone and e-mail address at the time of request. Bidders will not be required to be pre-qualified under ORS 279B.120. This contract is for a project that is subject to ORS 279C.800 to 279C.870 (Prevailing Wage Law). Bids may be withdrawn at any time, prior to opening, upon written request of the bidder. 1 Discrepancies between drawings and specifications, omissions, doubt as to meaning and other questions should be brought to the attention of the county or engineer not less than seven (7) days prior to bid opening and they will be answered by addendum addressed to all prime bidders of record. Questions received less than seven (7) days before the bid opening date cannot be answered by addendum.

Award

Bridges / Tunnels

$102,265.00

Public - County

Paving, Site Work

9

3

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
45
Bidding Soon
1,016
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

July 31, 2024

Project location map

To Be Determined, Tillamook, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.