Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a pipeline in Oshkosh, Wisconsin. Completed plans call for site work for a pipeline.
As of 6/27/2024 the Owner pulled this project, and it was put on hold. This will be re posted at a later date. Landfill Gas Treatment & Flare Equipment Installation. To install landfill gas treatment and flare equipment 112 Otter Avenue, Oshkosh, WI 54901 A Certified Check, Cashier's Check, or Bid Bond, Payable to Winnebago County in an Amount of Five Percent (5%) of the Bid Amount Must Accompany the Bid as a Guarantee That if the Bid is Accepted, the Bidder Will Execute and File the Proper Contract Within Ten (10) Days After Award of the Contract. Contractor Shall Furnish a Public Improvement Performance/labor and Materials Payment Bond Pursuant to Sec. 779.14 Wi Statutes, With a Surety Duly Authorized to and Licensed to Do Business in the State of Wisconsin for Use and Benefit of Claimants in an Amount Not Less Than the Contract Sum. We Reserve the Right to Reject Any and All Bids and to Accept the Bid(S) Considered Most Advantageous to Winnebago County. Question Deadline 08/05/2024 The Work includes: 1. Mobilization/demobilization 2. Phase 1 Prep and Demolition. 3. Site excavation, grading, and access road. 4. Concrete foundations for the new equipment skids and flare. 5. Installation of Owner provided Extraction Blower and Flare equipment. 6. Installation of Owner provided Compressor and Treatment Skid equipment. 7. Installation of Owner supplied LFG Equipment Power and Control equipment. 8. 6 to 12-inch dia. stainless steel LFG pipe (~180-ft). 9. 1inch dia. carbon steel condensate piping (~120-ft). 10. 2-inch dia. carbon steel glycol piping (~65-ft). 11. Power/control conduit, wire/cabling raceways for extraction blower skid, the new flare, the compressor treatment skid, the air-cooler, and the glycol chiller. 12. Heat-Trace and Insulation. 13. Main Control Panel and SCADA Integration. 14. Building Systems Modifications. 15. Phase 2 Demolition. 16. Participate in commissioning the facility. 17. Conduct project close-out and clean-up. 18. Provide Owner with operations and maintenance manuals and "as-built" drawings WORK SEQUENCE A. The sequence of the Work shall be the Contractor's responsibility. The Contractor shall submit a proposed sequence to the Engineer within 10 days after issuance of the notice to proceed. B. Provide for existing extraction blower and flare skid operation during the new equipment installation. This will require the LFG inlet piping, valving, and controls in the building, as well as the flare skid, to be operational during construction. C. Coordinate receipt, unloading, and installation, of the equipment skids and flare with the Owner/Engineer and per the manufacturer's requirements. D. Hire a System Integrator per the project specifications to coordinate integration of the new equipment controls with the new Main Control Panel and existing facility SCADA systems. E. Notify Owner/Engineer prior to adjustment to the work sequence during implementation of the project.
Award
Pipeline
$683,400.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2024
January 6, 2025
Multiple Locations, Oshkosh, WI
Related To This Project
Oshkosh, WI
Bid Date: Jul 10 2024
Oshkosh, WI
Bid Date: Jul 15 2024
Oshkosh, WI
Bid Date: Aug 27 2024
Oshkosh, WI
Bid Date: Jun 28 2024
Oshkosh, WI
Bid Date: Feb 25 2021
Oshkosh, WI
Bid Date: Oct 02 2020
Oshkosh, WI
Bid Date: Jul 24 2024
Oshkosh, WI
Bid Date: Jul 16 2024
Oshkosh, WI
Bid Date: Jul 01 2024
Oshkosh, WI
Bid Date: Jun 17 2024
Oshkosh, WI
Bid Date: Aug 15 2024
Oshkosh, WI
--
Oshkosh, WI
--
Oshkosh, WI
Bid Date: Jun 14 2024
Oshkosh, WI
Bid Date: Jun 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.