Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2024 at 8:00 PM
Updated September 19, 2024
Renovation of a military facility in Craig, Colorado. Completed plans call for the renovation of a military facility.
Lsfo - Sarvis Cabin Roof and Plumbing All questions must be submitted in writing via email. No questions will be accepted via phone calls. Only written RFI's will be considered and responded to by the Contracting Specialist. BLM responses to the RFI will be posted as an amendment to the solicitation Beta SAM. Installing a roof over the existing roof of the Sarvis Cabin a. Excavating and installing foundations for interior structural supports b. Demo existing framing and supports as needed and identified on the drawings. c. Providing and Installing framing for structural supports within the cabin d. Providing and Installing framing for roof supports within cabin e. Providing and Installing roof over-framing joists and insulation f. Providing and Installing exterior roofing material including roofing andunderlayments. g. Rerouting, providing new materials for, and installing existing roof penetrations through the new roof. 2. Installing a vault for a dry basin within the Sarvis Cabin a. Providing and installing a vault for a dry basin b. Connecting the proposed vault to the existing drain line beneath the existing patio slab. c. Providing and installing all necessary exterior piping and connections and cleanouts d. Providing and installing an alarm system to notify users the vault is full. e. Providing and installing a dry basin and all connections to the existing drain line within the existing countertop in the cabin interior Project Identification: 1. Project Location: Sarvis Cabin outside of Steamboat Springs, CO (40.30004294297945 N, 106.804976440660W) B. The Work consists of two primary objectives as detailed in the following specifications and drawings. 1. Installing a roof over the existing roof of the Sarvis Cabin a. Excavating and installing foundations for interior structural supports b. Demo existing framing and supports as needed and identified on the drawings. c. Providing and Installing framing for structural supports within the cabin d. Providing and Installing framing for roof supports within cabin e. Providing and Installing roof over-framing joists and insulation f. Providing and Installing exterior roofing material including roofing and underlayments. g. Rerouting, providing new materials for, and installing existing roof penetrations through the new roof. 2. Installing a vault for a dry basin within the Sarvis Cabin a. Providing and installing a vault for a dry basin b. Connecting the proposed vault to the existing drain line beneath the existing patio slab. c. Providing and installing all necessary exterior piping and connections and cleanouts d. Providing and installing an alarm system to notify users the vault is full. e. Providing and installing a dry basin and all connections to the existing drain line within the existing counter top in the cabin interior. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$250,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 9, 2024
October 1, 2024
455 Emerson St, Craig, CO
Related To This Project
Craig, CO
Bid Date: Jul 24 2024
Craig, CO
Bid Date: Aug 14 2024
Craig, CO
Bid Date: Aug 08 2024
Craig, CO
Bid Date: Aug 19 2024
Craig, CO
Bid Date: Oct 30 2024
Craig, CO
Bid Date: Dec 09 2024
Craig, CO
Bid Date: Jan 30 2025
Craig, CO
Bid Date: Jun 05 2024
Craig, CO
Bid Date: Mar 06 2025
Craig, CO
Bid Date: May 01 2024
Craig, CO
Bid Date: May 21 2024
Craig, CO
Bid Date: Aug 22 2024
Craig, CO
Bid Date: May 07 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
