Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 23, 2024 at 8:00 PM
Updated August 24, 2024
Site work and paving for a road / highway in Craig, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Region: 3 Counties: Moffat Contract UDBE Goal: 0.00 % Fixed Completion Date: 10/30/2024 Sh 040a in Moffat County Crack Seal Sh40 Mp 7.0 to Mo 21.0, Both Directions Cdot Section 6 - Craig This project is located in Region 3 in Moffat County. Project work consists of crack seal work on SH40 from MP 7 to MP 21 in both directions. Please contact Jim Fox at 720-241-6309 for all project related questions.. It is estimated that the total cost of all items in the bid will be: (X) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CO DOT: 003 - Region 3 - SH40 Crack Seal *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Description 208.01 This work consists of constructing, installing, maintaining, and removing when required, control measures during the life of the Contract to prevent or minimize erosion, sedimentation, and pollution of any State waters as defined Section 101. Stormwater runoff from all disturbed areas and soil storage areas for which permanent or interim stabilization is not implemented, must flow to at least one control measure to minimize sediment in the discharge. This shall be accomplished through filtering, settling, or straining. The control measure shall be selected, designed, installed, and adequately sized in accordance with good engineering, hydrologic, and pollution control practices. The control measures shall contain or filter flows in order to prevent the bypass of flows without treatment and shall be appropriate for stormwater runoff from disturbed areas and for the expected flow rate, duration, and flow conditions (i.e., sheet or concentrated flow). The Contractor shall coordinate the construction of temporary control measures with the construction of permanent control measures to assure economical, effective, and continuous erosion and sediment control throughout the construction period.
Award
Roads / Highways
$436,584.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 8, 2024
September 9, 2024
US-40, Craig, CO
Related To This Project
Craig, CO
Bid Date: Aug 19 2024
Craig, CO
Bid Date: Oct 30 2024
Craig, CO
Bid Date: Dec 09 2024
Craig, CO
Bid Date: Jan 30 2025
Craig, CO
Bid Date: Dec 26 2024
Craig, CO
Bid Date: Feb 03 2025
Craig, CO
Bid Date: Feb 03 2025
Craig, CO
Bid Date: Aug 14 2024
Craig, CO
Bid Date: Jul 24 2024
Craig, CO
Bid Date: Aug 09 2024
Craig, CO
Bid Date: Jun 05 2024
Craig, CO
Bid Date: Mar 06 2025
Craig, CO
Bid Date: May 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
