BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Sudbury, Massachusetts. Conceptual plans call for site work for a transportation facility.

Amtrak is accepting Letters of Interest for the Construction to replace a damaged Autotransformer (AT2) at the Amtrak Norton switching station. Responses are to include qualification information requested/stated below. Amtrak, at its sole discretion and without discussion, will determine which Contractors are to be added to its short list for the forthcoming Request for Proposal. This project involves replacing a damaged Autotransformer (AT2) at the Amtrak Norton switching station. The existing autotransformer is rated 1 Phase, 10MVA, 55KV/27.5KV, 60Hz. The supplies to be furnished under this contract are manufacture, delivery, and site services for one (1) Autotransformer. The selected construction firm shall design, manufacture, and deliver the transformer per Amtrak Autotransformer specification. This work includes: This Scope of Services is intended for a construction firm to provide Amtrak with site services for a complete replacement of one (1) 10MVA Autotransformer. The contractor's scope shall include but is not limited to the following: 1) Removal and disposal of existing Autotransformer (AT1), to include draining and environmentally compliant disposal of approximately 1100 gallons of transformer oil. 2) Installation and assembly of replacement Autotransformer (AT1) 3) Oil filling (if applicable) and topping-off of oil level prior to commissioning. 4) On-site acceptance testing and commissioning of replacement transformer in accordance with manufacturer's recommended test procedure. 5) Fabrication and installation of replacement conductor pipes. (Replacement transformer bushing heights and locations differ from original 5) All transformer bus and grounding terminations 6) Removal of existing AT1 control cables 7) Installation of new AT1 control cables 8) Crane(s), rigging, track bridges and all other specialized equipment required for removal and installation In an effort to provide "maximum practicable opportunity" to participate in the provision of goods and services to Amtrak, prime firms under agreement with Amtrak are required to put forth Good Faith Efforts to contract with Disadvantaged Business Enterprises (DBEs). Therefore, a DBE subcontracting plan goal shall be established for this opportunity. The method of Contractor Selection has not been Determined at this time.

Conceptual

Transportation Terminals

$200,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
619
Active Projects
366
Bidding Soon
4,873
All Active Projects
1,997
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 1, 2025

img_map_placeholder

To Be Determined, Sudbury, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.