EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Middlefield, Massachusetts. Completed plans call for the renovation of a municipal facility.

Middlefield Town Hall - Floor Tile Installation. Installation of 18' x 18' Luxury Vinyl Floor Tile, cove base, and moisture barrier at Middlefield Town Hall. The Town is requesting bids for the Installation of Luxury Vinyl Plank flooring 18 x 18 including floor leveling if required, installation of floor water barrier and installation of Armstrong Luxury Vinyl floor tile or approved equal as noted in the project design at the Middlefield Town Hall. All work will coincide with the attached Division 1 specification, site map and schedule outlined in the specifications. It is essential to ensure that the work can occur in a timely manner. The timeline is very tight, and the work must occur as soon as possible. The site is used for Town offices, and it is desired to get town hall employees to utilize the building as soon as possible. Based on this tight timeline we are looking for an extremely aggressive response and professional installation of all flooring. The Plan is to perform the project in two phases so that all furnishings and equipment can remain in the building. It is expected that the move will be accomplished as follows. (Phase One) Phase One will include the removal of asbestos floor tile and related products from the Library, Office A, and Office B Rooms. The Moving contractor will move all books, furniture, computers, and other equipment from these spaces to the All Purpose Room. Some furniture being moved will be arranged in the All Purpose Room to allow office personnel to continue working as necessary during the project. A member of the Town staff will be on site to instruct moving staff on the layout of the furniture. The abatement contractor will then be called to abate the tile and related products from the vacated spaces. When the floors have been abated and hygienically tested to ensure they are clean the moisture testing contractor will perform his testing of the concrete slab. Once the testing results are known, the flooring contractor will prep the floors and install new floor tile. Questions deadline: 7/2/24 at 4:30 PM, Questions regarding the IFB should be in writing and delivered via email to seancurran2023@gmail.com All inquiries related to the requirements should prominently refer to Bid No. 25-002, Middlefield Town Hall Floor Tile Installation, and the bid opening date. In order to be considered, questions must be made in writing and received by the Town Administrator no later than July 2, 2024 at 4:30 P.M. Responses to inquiries will be in the form of a numbered addendum to the specifications issued by the Town Administrator sent to all parties listed in the bid file as Bidders(s) holding the bid documents. Bidders should base responses only on the specifications including any addenda The Town intends to award a single contract to the contractor that is the lowest responsible and responsive bidder offering the lowest price for services. The contract has an estimated value of Eighty Dollars and 00/100 ($80,000.00). The contract is for a one-time service and is not renewable in nature. The Town of Middlefield Massachusetts (the "Town") is seeking bids from qualified firms to enter into an agreement to provide Luxury Vinyl Floor Tile Installation and Related Work at the Middlefield Town Hall located at 188 Skyline Trail Middlefield, MA 01243. The Town of Middlefield is issuing this Bid solicitation for Middlefield Town Hall Floor Tile Installation located at 188 Skyline Trail Middlefield, MA 01243. In general, the Contractor shall supply all labor, equipment, materials, temporary storage, facilities, tools, and other appliances necessary for the work in this section and as required to properly complete the project in accordance with these contract documents and good construction practice. All costs associated with the above-described work as well as work described under the Contract shall be borne by the Contractor. The Town of Middlefield shall not be responsible for any additional costs associated with this work. 3. The Town of Middlefield has retained an Air Quality Testing Consultant and a Moisture Testing Consultant for Project Design, Technical Advisement and Administration of the Contract. All work shall be subject to final approval by the testing firms and the Owner. The Contractor shall regard the testing firm's direction as authoritative and binding as provided herein, in matters outlined by this Section and the Contract Documents.

Award

Municipal

$73,500.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
184
Bidding Soon
2,510
All Active Projects
1,168
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

July 29, 2024

img_map_placeholder

188 Skyline Trail, Middlefield, MA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Middlefield Town Hall Floor Tile Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.