Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 2, 2026 at 7:00 PM

Updated November 9, 2026

Demolition, site work, paving, renovation and addition to a conference / convention center in Dallas, Texas. Working plans call for the renovation of a conference / convention center; for the addition of a conference / convention center; for the demolition of a conference / convention center; and for site work for a conference / convention center.

https://www.bizjournals.com/dallas/news/2026/10/26/development-team-buys-last-piece-greyhound-station.html For the southern sector of downtown Dallas, the deal represents the latest in a series of investments and movement in the area. A couple of those include the $3.8 billion redevelopment of the Kay Bailey Hutchison Convention Center and a major overhaul planned for the city's tallest skyscraper, Bank of America Plaza. _______________________________________________________________________________________________________ https://www.bizjournals.com/dallas/news/2026/09/30/ddi-vision-2036-downtown-dallas.html Major changes in that vein already taking place downtown include Dallas Community College District investing $500 million for refresh its El Centro campus, the $3 billion-plus facelift to the Kay Bailey Hutchison Convention Center and Texas Women's University searching for a landing spot for a new downtown campus to open in 2027. ___________________________________________________________________________________________________________________________ Dallas' Kay Bailey Hutchison Convention Center began a $3.8 billion redevelopment in 2024. Dallas’ Kay Bailey Hutchison Convention Center, meanwhile, kicked off a whopping redevelopment in 2024 that is expected to debut in 2030. The overhaul will expand exhibition halls in the center by 76,000 square feet, double its ballroom space to 170,000 square feet and nearly triple its meeting room space to 260,000 square feet. ------------------------------------------------ https://dallasexpress.com/city/dallas-city-council-votes-9-6-to-keep-lowered-convention-center-design-eliminate-oak-cliff-viaducts/ Dallas City Council Votes 9-6 To Keep Lowered Convention Center Design, Eliminate Oak Cliff Viaducts Dallas Express | Jun 25, 2026 Share On Conceptual rendering of interior of expanded KBHCCD | Image by KBHCCD/website The Dallas City Council voted 9-6 on Wednesday to move forward with the current redesign of the Kay Bailey Hutchison Convention Center, rejecting a proposal that would have restored the project’s original height and preserved existing traffic patterns between Oak Cliff and downtown Dallas. The decision keeps construction on schedule but will ultimately eliminate the current configuration of the Houston Street and Jefferson Street viaducts. These two major routes connect southern Dallas neighborhoods to the city’s central business district. City leaders said reversing course would have significantly increased costs and delayed the convention center project, while opponents argued the plan would weaken a critical transportation link for residents. Convention Center Height Debate The controversy centers on a redesign that lowered the convention center by two stories as part of a cost-saving effort intended to reduce project expenses by roughly $500 million. Under the original plan, the convention center would have been tall enough to allow traffic on the Houston Street and Jefferson Street viaducts to continue passing beneath the structure. The lower design eliminates that possibility, requiring changes to how traffic moves between Oak Cliff and downtown. Earlier this month, the city’s Transportation and Infrastructure Committee recommended returning to the taller design to preserve the existing viaduct connections. However, city staff warned that such a move would require a major redesign and create substantial delays. Cost And Delay Concerns In a memo to council members, Dallas City Manager Kimberly Bizor Tolbert estimated that reverting to the original design would add approximately $597 million to the project’s cost and push the convention center’s opening into 2030, at least a year later than currently planned. According to the city manager, the delay could result in more than $271 million in lost convention-related business, with additional losses estimated at $1.4 million per month. Clay Cooley Web Ads_300x250.jpg Visit Dallas President and CEO Craig Davis urged council members to keep the project moving. “I’m here on behalf of the 60,000 workers whose livelihoods depend on what you decide here today,” Davis told council members, per Fox 4 KDFW. “Last week, we notified over 40 convention organizers that we could not accommodate them in 2030 as originally promised. That is nearly 2 billion in spending leaving the city.” Davis said the convention center’s closure has already cost the city millions in economic activity and forced the relocation of dozens of events. Concerns Over Oak Cliff Access Residents and community leaders from Oak Cliff voiced concerns that the redesign will make it more difficult to reach downtown. Under the city’s current proposal, Houston Street would be reduced to one lane in each direction. Jefferson Boulevard would maintain two lanes in each direction but would terminate near the Reunion parking garage south of the convention center. A future flyover ramp connecting Jefferson to Houston Street would be built later, though no final design or funding plan has been approved. Dallas City Council member Chad West, whose district includes parts of Oak Cliff, opposed the plan. “We shouldn’t be cutting off access, we should improve it,” West said, WFAA reported. “We will make a decision that cannot be undone.” West later said he could not support a plan that limits Oak Cliff’s connection to downtown after years of concerns about investment and accessibility in southern Dallas. Bishop Arts Neighborhood Association President William Joy also criticized the proposal. Clay Cooley Web Ads_970x250.jpg “Should the city that just lost its signature downtown retailer, its signature downtown employer, both of its downtown sports teams, while cities across our region are spending hundreds of millions to draw people into their downtowns, run around and make it more difficult for its own residents to reach our core?” Joy said, per Fox 4. Resident Linda Vanderford framed the issue as a choice between supporting visitors and serving residents. “The convention center serves visitors,” she said, per WFAA. “The viaduct serves the residents.” Council Moves Forward Supporters of the current plan argued that another redesign would jeopardize the project’s economic benefits and further delay construction. Councilwoman Kathy Stewart said she could not support returning to the original height due to the added costs and the potential loss of convention business. Following the vote, the council directed city staff to continue advancing the project without additional delays. In a statement, Tolbert said the city remains committed to improving transportation connections among downtown, Oak Cliff, and southern Dallas while proceeding with construction of the convention center. “We are committed to getting the connection right, and to doing it with the community, not around it,” Tolbert said, CBS News Texas reported. “Moving forward on the convention center does not slow that work. It lets both move at once.” While the convention center project will proceed under the approved design, questions remain about the final configuration of the Houston and Jefferson viaducts and whether future roadway changes will require additional City Council approval. ------------------------------------- https://www.star-telegram.com/sports/spt-columns-blogs/mac-engel/article315969455.html If the Stars leave Dallas for Plano, it would leave the Wings of the WNBA as the only constant show in downtown Dallas. The Wings are scheduled to move from the College Park Center on the campus of Texas-Arlington for Dallas after this season; they are supposed to have a permanent home at the "eventually" refurbished Dallas Memorial Auditorium, which is part of the $2 billion renovation to the Kay Bailey Hutchison Convention Center. ________________________________________________________________________________________________________________________________________ https://www.bisnow.com/dallas-ft-worth/news/commercial-real-estate/dallas-wings-get-control-of-81m-practice-facility-construction-133844 The city is moving forward with renovations to the Dallas Memorial Auditorium at the Kay Bailey Hutchison Convention Center, with the facility eventually serving as the Wings' home arena. The renovated arena was also originally expected to be ready for this year’s WNBA season, but construction delays have pushed that timeline to April 2028. _______________________ https://www.bizjournals.com/dallas/news/2026/02/26/convention-center-settlement-washburne-demolition.html Dallas settles with Washburne, moves ahead with convention center demo Demolition has officially begun for the redevelopment of the Kay Bailey Hutchison Convention Center. It came after the city settled an eminent domain lawsuit with one of Ray Washburne's companies for roughly $11.3 million. Dallas moves ahead with Kay Bailey Hutchison Convention Center redevelopment Project Overview: The Kay Bailey Hutchison Convention Center in Dallas is undergoing redevelopment. Demolition has officially begun. Legal / Ownership Context: The city settled an eminent domain lawsuit with one of Ray Washburne's companies. Settlement amount: roughly $11.3 million. Scope / Design: A rendering in the article shows a vision of the redeveloped convention center. The article does not provide confirmed details such as total project value, construction timeline, or contractors involved. Type of Work: Demolition of existing structures is underway as part of the redevelopment. The article implies new construction will follow but does not confirm specifics. Image / Caption: Rendering caption: "A rendering of how the redeveloped Kay Bailey Hutchison Convention Center could look." Image credit: Amplify Dallas Published: Feb. 26, 2026 Reporter: Plamedie Ifasso Confirmed Details Only: Demolition has begun at the Kay Bailey Hutchison Convention Center Settlement with Ray Washburne's company for ~$11.3 million resolved eminent domain issues Redevelopment planned (rendering shown) No confirmed project cost, timeline, contractor, or detailed scope provided in the article preview _____________________________________________________________________________________________________________________ https://www.bizjournals.com/dallas/news/2026/01/19/central-library-reimagining-incentives-changes.html Potential major changes are being considered for the Dallas Public Library system, including the J. Erik Jonsson Central Library in downtown Dallas. The Central Library is located at 1515 Young St., across from City Hall, as noted in the image caption. The article preview indicates that next steps are being outlined for the rebuild of the Kay Bailey Hutchison Convention Center and that Dallas incentive policies are set to be tweaked. These topics are part of the Dallas Business Journal's "On the Agenda" feature. The provided article content does not explicitly state any confirmed construction scope, project value, timelines, whether changes to the Central Library involve renovation or new construction, or which entities or developers may be involved. _______________________________________________________________________________________________________________________________ As of December 2, 2025, this project is in schematic design. Architects and a Joint Venture Construction Manager at Risk team have been selected. A timeline for bidding and construction has yet to be announced. *The closed solicitation has been included below for reference: The City of Dallas, through its Convention and Event Services (CES) Department, seeks to engage a Construction Manager at Risk ("CMAR") to provide preconstruction and construction services under a twostep solicitation process. This Request for Qualifications ("RFQ") is for the first step and the City seeks statements of qualifications ("Qualifications Statements" or "SOQ") from firms to provide CMAR services for The Black Academy of Arts and Letters ("TBAAL") renovation and expansion, Component 4 which is a portion of KBHCCD Master Plan (hereinafter referred to as "TBAAL Renovation & Expansion Project", "Component 4" or more simply, the "Project"). The Project may require delivery of several Guaranteed Maximum Price ("GMP") contract(s), as scheduling necessitates. The Question & Answer due date has re-opened. Please submit your questions no later than Tuesday, October 15, 2024, at 1:00 PM. The implementation of the Kay Bailey Hutchison Convention Center Dallas ("KBHCCD") Master Plan (hereinafter referred to as "the Project") was ultimately divided into seven (7) fundable components as outlined below: 1. KBHCCD Convention Center Expansion and proposed Enhanced Greenspace connector using the Construction Manager At-Risk Delivery Model, and the Demolition of the Existing Convention Center 2. Transportation-Related Alternatives 3. Dallas Memorial Auditorium (Arena) using either Design Bid Build or Construction Manager At-Risk Delivery Model 4. The Black Academy of Arts and Letters (TBAAL) using a Design Bid Build or Construction Manager At-Risk Delivery Model 5. Pioneer Plaza and Pioneer Cemetery 6. Eddie Bernice Johnson Union Station 7. Land Use and Development on City of Dallas owned property within the downtown area. SCOPE OF SERVICES The City of Dallas - Convention and Event Services Department (CES) is seeking Qualifications Statements from firm(s) to perform Construction Manager at Risk (CMAR) Services for the TBAAL renovation and expansion - Component 4 only of KBHCCD Master Plan.

Pre-Construction/Negotiated

Conference / Convention Centers

$250,000,000.00

Public - City

Addition, Demolition, Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
420
Active Projects
144
Bidding Soon
4,601
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

November 3, 2026

Project location map

1309 Canton St, Dallas, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed