BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Saratoga Springs, Utah. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The CM/GC must be capable of and willing to work closely with Alpine School District representatives and the selected architect (VCBO Architecture), through the design phase, providing cost estimates, schedules, and feedback on design details, phasing, and availability of materials selected. The new building will be approximately 340,000 square feet on an approximately 60-acre parcel in Saratoga Springs, Utah. Construction is projected to start in 2025, and the project is to be completed April 1, 2028. The Fixed Limit of Construction Cost (FLCC) for the CM/GC is $129,200,000. The purpose of this RFP is to enter into a contract to provide: CM/GC Services for a new High School to be built in Saratoga Springs, UT. It is anticipated that this RFP will result in a single contract award to the responsive and responsible offeror with the highest score justified by the procurement code. Length of the Contract The contract resulting from this RFP will be for the duration of this project. Background Alpine School District ("ASD") is growing and as a result, has the need for a new High School in Saratoga Springs, Utah. Issuing Procurement Unit, Conducting Procurement Unit, and Solicitation Number Alpine School District's Department of Purchasing is the issuing procurement unit and Alpine School District Physical Facilities Department is the conducting procurement unit for this RFP (referred to as "the District"). Additional Information Offerors are prohibited from communications regarding this RFP with the conducting procurement unit staff, evaluation committee members, or other associated individuals EXCEPT the District's Department of Purchasing procurement officer overseeing this RFP. Wherever in this RFP an item is defined by using a trade name, brand name, or a manufacturer and/or model number, it is intended that the words, "or equivalent" apply; and invites the submission of equivalent products by the Offerors. If an equivalent is submitted the bidder must present sufficient evidence that the "equivalent" brand proposed meets and or exceeds the required specifications of the listed brand in the solicitation. The bidder has the burden to prove equivalence and the bidder will be considered unresponsive if this information is not supplied in detail. The conducting unit has the right to determine if the supplied information is sufficient and if the equivalent will be accepted. Offerors may be required to submit product samples to assist the chief procurement officer or head of a procurement unit with independent procurement authority in evaluating whether a procurement item meets the specifications and other requirements set forth Description in the request for proposals. Product samples must be furnished free of charge unless otherwise stated in the invitation for proposals, and if not destroyed by testing, will upon written request within any deadline stated in the invitation for proposals, be returned at the Offeror's expense. Samples must be labeled or otherwise identified as specified in the invitation for proposals by the procurement unit. The District reserves the right to conduct discussions with the Offerors who submit proposals determined to be reasonably susceptible of being selected for award, followed by an opportunity to make best and final offers pursuant to UCA 63G-6a-707.5, but proposals may be accepted without discussions. New Technology Pursuant to Utah Administrative Rule R33-12-502 the awarded contract(s) may be modified to incorporate new technology or technological upgrades associated with the procurement item being solicited, including new or upgraded: (i) systems; (ii) apparatuses; (iii) modules; (iv) components; and (v) other supplementary items. Further, a maintenance or service agreement associated with the procurement item under the resulting contract(s) may be modified to include any new technology or technological upgrades. Any contract modification incorporating new technology or technological upgrades will be specific to the procurement item being solicited and substantially within the scope of the original procurement or contract. Evaluation Administrative and Mandatory Minimum Requirement Compliance Each proposal received shall be evaluated as outlined in this RFP and the Utah Procurement Code. To be responsive and responsible Offerors must review and respond to the following sections of this RFP: prerequisites, buyer attachments, and questions. o The Prerequisites section includes the objective and subjective criteria that will be used to evaluate the proposals, which include the mandatory minimum requirements, technical criteria, and other prerequisites that Offerors must read and agree to in order to respond to this RFP. o The Buyer Attachments section includes the standard contractual terms and conditions of this RFP and other documents required for this RFP. o The Questions section allows the District to ask Offerors questions regarding this RFP. Offerors must review each section carefully. To determine which proposal provides the best value to the conducting procurement unit, the evaluation committee shall evaluate each responsive and responsible proposal that has not been disqualified from consideration under the provisions of Part 7 of Utah Code 63G-6a, using the criteria described in this RFP. After the evaluation and final scoring of proposals is completed, the District shall award the contract as soon as practicable (subject to the requirements of Utah Code Section 63G-6a-707(10) to the eligible responsive and responsible Offeror, subject to Utah Code Section 63G-6a-707(10), provided the RFP is not canceled in accordance with Utah Code Section 63G-6a-902. Question Submission Close Date 7/5/2024 2:00 PM MDT

Award

Educational

$129,200,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
30
Bidding Soon
537
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

March 10, 2025

img_map_placeholder

To Be Determined, Saratoga Springs, UT


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.