Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Burr Ridge, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
79th Street Sidewalk Improvements Project The Village of Burr Ridge will receive sealed bids to furnish all labor, materials, supplies, and equipment necessary to construct PCC sidewalk, asphalt pathway removal, sidewalk removal, accessible ramps, curb removal and replacement, driveway removal and replacement, storm sewer, storm manhole and pipe culvert installation, RRFB, pavement patching, roadway resurfacing, tree removal, landscaping restoration, and all incidental and collateral work necessary to complete the project as shown on the plans and specifications. The length of the project is approx. 0.5 mile Contractor shall not pay less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12) and Employment of Illinois Workers on Public Works Act (30 ILCS 570/0.01). Proposals must be accompanied by a proposal guaranty. The Village reserves the right to waive technicalities and to reject any or all proposals. LOCATION OF PROJECT 79th Street: County Line Road to Burr Oak Lane. Approximately 0.49 miles. DESCRIPTION OF PROJECT The work of this Project includes PCC sidewalk installation, asphalt removal, topsoil furnish & place, sodding, parkway restoration, ADA curb ramps, driveway apron removal and replacement, Hot-Mix Asphalt (HMA) milling and resurfacing, removal and disposal of unsuitable materials, tree protection, and all incidental, appurtenant, and collateral work therefor (collectively the "project") necessary to complete the project within the project limits.
Award
Sidewalks / Parking Lot
$569,825.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2024
August 12, 2024
79th St, Burr Ridge, IL
Related To This Project
Burr Ridge, IL
Bid Date: Jul 05 2024
Burr Ridge, IL
Bid Date: Jul 16 2024
Burr Ridge, IL
--
Burr Ridge, IL
Bid Date: Nov 04 2024
Burr Ridge, IL
Bid Date: Nov 07 2024
Burr Ridge, IL
Bid Date: Jun 20 2024
Burr Ridge, IL
Bid Date: Apr 11 2024
Burr Ridge, IL
Bid Date: Apr 04 2024
Burr Ridge, IL
Bid Date: Feb 15 2024
Burr Ridge, IL
Bid Date: Feb 15 2024
Burr Ridge, IL
Bid Date: Feb 15 2024
Burr Ridge, IL
Bid Date: Nov 17 2023
Burr Ridge, IL
Bid Date: Feb 11 2020
Burr Ridge, IL
Bid Date: Mar 18 2022
Burr Ridge, IL
Bid Date: Mar 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.