Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in John Day, Oregon. Contact the soliciting agency for additional information.
The work consists of the following construction: Schedule 'A' Holliday Quarry, is the production of 2,500 cubic yards of 3/4" minus road base rock, 7,000 cubic yards of 1 1/2" minus road base rock, 8,000 cubic yards of 3/8" sanding rock, 18,000 cubic yards of 1/2" chip seal rock, 2,000 cubic yards of 3/8" chip seal rock, stockpiled at the specified locations. The contractor is responsible for all the labor, equipment, and materials needed for drilling, blasting, crushing, hauling, traffic control, water hauling, pollution and erosion control necessary to produce this product. Schedule 'B' Top Road BLM Quarry, is the production of 32,000 cubic yards of 1 1/2" minus road base rock, 3,500 cubic yards of 3" minus crushed rock, and 2500 cubic yards of 1/2" chip seal rock, stockpiled at the specified locations.. The contractor is responsible for all the labor, equipment, and materials needed for drilling, blasting, crushing, hauling, traffic control, water hauling, pollution and erosion control necessary to produce this product. The point of contact for this procurement will be the Road Master, Alan Hickerson. All questions or issues that may arise regarding bidding, bid award process, or specifications shall be directed to the Road Master or Project Engineer. Bidders may bid on one or both bid schedules. Work is to commence after the date of the Notice to Proceed and shall be completed within 120 calendar days of said Notice to Proceed but, no later than December 31st, 2024, unless extension is approved. Contracts will be awarded for each schedule of work in the proposal. Contracts will be awarded to the lowest responsive and responsible bidder meeting all the requirements of the bid submission, qualifications, references, and specifications offering the total lowest price for each schedule. Grant County Road Department reserves the right to withdraw any item(s) from the award if it is in their best interest. All proposals shall be made on proposal forms, accompanied by completed Bidder's Certification Statements, Drug Testing Program Certification Form, Insurance Requirements Form, Proposal Form, Bid Bond (10%), and First-Tier Subcontractor Disclosure Form (within two hours of bid closing). Once awarded a one hundred percent (100%) performance bond and one hundred percent (100%) payment bond will be required to guarantee the faithful performance of the contract. Grant County Road Department may cancel this procurement or reject any or all bids
Post-Bid
Roads / Highways
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 9, 2024
August 9, 2024
Multiple Locations, John Day, OR
Related To This Project
John Day, OR
Bid Date: Aug 22 2024
John Day, OR
Bid Date: Jun 20 2024
John Day, OR
Bid Date: Jun 27 2024
John Day, OR
Bid Date: Aug 15 2024
John Day, OR
--
John Day, OR
Bid Date: May 17 2024
John Day, OR
--
John Day, OR
Bid Date: Jan 23 2024
John Day, OR
Bid Date: Oct 13 2023
John Day, OR
Bid Date: Dec 16 2021
John Day, OR
Bid Date: Apr 27 2023
John Day, OR
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.