BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Tampa, Florida. Contact the soliciting agency for additional information.

Port Tampa Bay (PTB) is soliciting proposals from qualified Contractors interested in providing maintenance and repair services for elevators / escalators at the following PTB locations: a. Port Administration Building b. Cruise Terminal #2 c. Cruise Terminal #3 d. Cruise Terminal #6 e. Security Operations Center The Parking Garage location may be added at later date and will be priced as an "alternate" for the purpose of this Procurement. It is the intention of PTB to purchase services as specified herein from a contractor who will give prompt and professional service to achieve optimum performance of the equipment covered by this contract. Any failure of the contractor to comply with these conditions may be cause for imposing a penalty or terminating the contract. The successful contractor shall be responsible for furnishing all labor, tools, materials, equipment, supervision, inspection and complete mechanical maintenance service, preventive maintenance, emergency services and replacement of worn or defective parts and devices for elevators and escalators located at various locations throughout PTB as specified and as required during the duration of the contract. The purpose of this contract is to put into operation a continuing system of preventive maintenance to provide necessary, systematic, periodic service and maintenance for the elevator(s) and escalator(s) listed in the proposal. Monday, July 8, 2024 at 5:00 p.m. Respondent Question Deadline Wednesday, July 10, 2024 at 5:00 p.m. PTB Question / Answer Deadline Thursday, September 20, 2024 Start Date (TENTATIVE): Contract or Notice to Proceed. PTB reserves the right to request additional information and clarification of any information submitted, including any omission from the original response. Additionally, the Evaluation Committee (Committee) reserves the right to waive any informalities or irregularities in any response and to reject any and/or all responses, in its sole discretion.

Post-Bid

Transportation Terminals

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
57
Bidding Soon
1,259
All Active Projects
506
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.