BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Seattle, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The Port of Seattle invites the submittal of Statement of Qualifications (SOQs) from firms, or teams of firms, interested in providing Design Build services for the Terminal 5 Container Yard Expansion at Terminal 5 - 3443 W Marginal Way SW, Seattle, WA 98106. This project will redevelop six acres of property at the Terminal 5 (T5) cargo facility for the purpose of increasing cargo container handling capacity and add flexibility for the handling and staging of export cargo containers. Project is federally funded with two U.S. Department of Transportation (USDOT) grants. The project will clear the site and bring the pavement to acceptable cargo load capacity and grading standards, including all access vaults, lift station and utility covers and be permitted by City of Seattle prior to start of construction. The area is adjacent to and on an active cargo terminal. Portions of site requires Transportation Worker Identification Credential (TWIC) badge access and the Contractor will need to minimize impacts to the tenant operations. The Port of Seattle is an Equal Opportunity Employer and encourages Disadvantaged Business Enterprises (DBE) to participate in the competitive process. In support of the DBE Community, the Port of Seattle has established a DBE utilization goal. The DBE utilization goal is 10% for this contract. Question Deadline 07/10/2024 4:30:00 AM Communication with the Port regarding this Solicitation shall be directed to the Central Procurement Office, Beth Sisk, at (206) 787-4760, or Sisk.B@portseattle.org. Title VI Discrimination Complaint Forms may be obtained from the office of the Title VI Coordinator at no cost to the complainant by calling (206) 787-4066 or sending an email to mailbox.t3@portseattle.org Scope of Work Redevelop six acres of property at the Terminal 5 (T5) cargo facility for the purpose of increasing cargo container handling capacity and add flexibility for the handling and staging of export cargo containers. Project is federally funded with two U.S. Department of Transportation (USDOT) grants. The project will clear the site and bring the pavement to acceptable cargo load capacity and grading standards, including all access vaults, lift station and utility covers and be permitted by City of Seattle prior to start of construction. The area is adjacent to and on an active cargo terminal. Portions of site requires Transportation Worker Identification Credential (TWIC) badge access and the Contractor will need to minimize impacts to the tenant operations. The scope of work of this project consists of design, permitting, demolition, and other site improvements. The following bullet points provide some guidance on generic tasks that are required on this project o Demolition of structure, fuel pump stations and perimeter lighting o Paving improvements o Stormwater o Electrical upgrades o Code Related Fire Life Safety upgrades o Fence Installation o Tenant Coordination o Soil and Groundwater Management Temporary Erosion and Sediment Control Plan (TESC) 4.2. Procurement

Post-Bid

Water / Sewer

$13,907,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
30
Bidding Soon
897
All Active Projects
365
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

November 25, 2024

img_map_placeholder

3443 W Marginal Wy SW, Seattle, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.