EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Fairport, New York. Completed plans call for site work for a water / sewer project.

**As of August 09, 2024, this project has not yet been awarded. A timeline for award has not yet been established. 2024 Pump Station Rehabilitation Project The work to be performed consists of removing and disposing existing duplex submersible pumps, pump rail guides, control panels, etc. and installing new duplex submersible pumps, control panels and other related items needed to make completely operative pump stations at three (3) station locations in the Town of Perinton: Location #1- 45 Brooktree Dr, Location #2 - 339 Whitney Rd and Location #3 - 31 Little Brook Dr. Attention of the bidders is particularly directed to the requirements of the conditions of employment to be observed and minimum Wage Rates to be paid under the Contract. The Work will be substantially completed within 150 days after the date when the Contract Times commence to run as provided in Paragraph 14.7 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.7 of the General Conditions The Town of Perinton does not discriminate on the basis of handicapped status in admission or access to, or treatment or employment in, its programs and activities. The Town of Perinton, Monroe County, New York, reserves the right to reject any or all bids, or to waive any informalities, or to make an award to other than the low bidder. It further reserves the right to limit the amount of the award. A Pre-Bid Conference will not be held for this project All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing

Bid Results

Water / Sewer

$583,545.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

22

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Vehicle Lifts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
131
Bidding Soon
1,420
All Active Projects
614
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

August 19, 2024

img_map_placeholder

Multiple Locations, Fairport, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Pump Station Rehabilitation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.