BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lakeway, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of September 10, 2024, project was awarded to Jerdon Enterprises, L.P. Contract, awarded amount is $$625,696.75. The Work consists of the installation of a traffic signal, the construction of accessible sidewalks, ramps and pavement markings associated with the improvements at the intersection of Wild Cherry Drive and Flint Rock Road. The City of Lakeway, Texas is requesting sealed written Bids for furnishing all labor, materials, equipment, supervision, and incidentals, and for performing all Work required for the INTERSECTION IMPROVEMENTS AT WILD CHERRY AND FLINT ROCK ROAD project, to include, in part: The installation of a traffic signal, the construction of accessible curb ramps, sidewalk, curb, and pavement markings associated with the improvements at the intersection of Wild Cherry Drive and Flint Rock Road. Contractor awarded the project shall be required to furnish an acceptable Performance and Payment Bond in the amount of one hundred percent (100%) of the contract price. The bonds shall be issued by a solvent corporate surety company authorized to do business in the State of Texas and shall meet any other requirements established by law or by the City pursuant to applicable law. A Maintenance Bond will be required in the amount of ten percent (10%) of the contract price and is to remain in force for a period of one-year from the contractual warranty period, and date of the letter of final conditional acceptance from the City of Lakeway. Contract Time is of the essence and all Base Bid Work shall be completed within sixty (60) calendar days after the date specified in the Notice to Proceed, in accordance with the Bid Form, Section 00300U. Liquidated damages are $1,000 per Calendar Day for failure to complete the work within the allotted time. Deadline for submitting questions is July 17, 2024. Questions regarding the Invitation for Bid shall be emailed to: Ruena Victorino, Purchasing Coordinator Phone: 512-314-7522 Email: ruenavictorino@lakeway-tx.gov

Award

Roads / Highways

$625,697.00

Public - City

Paving, Site Work

30

9

18

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
45
Bidding Soon
2,443
All Active Projects
923
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

September 10, 2024

img_map_placeholder

Wild Cherry Dr & Flint Rock Rd, Lakeway, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.