Site work and new construction of a civil project in Winnipeg, Manitoba. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Work to be done under the Contract shall consist of the construction of a new dry well/wet well type wastewater pumping station complete with a backup generator and other site amenities. The complete Scope of Work is described in the Drawings and Specifications. The major components of the Work are as follows: (a) Shaft construction to accommodate the Work associated with this project. (b) Connection of a new 1200 mm PVC sewer to a sewer installed by the interceptor construction team (Contract 3) at the property line of the lift station site. (c) A new 3.65 m diameter precast concrete wet well to receive the wastewater from the sewer. (d) A new 3.65 m diameter Fibreglass Reinforced Plastic (FRP) dry well complete with pumps, valves, access platforms, sump, sump pump, motors and other appurtenances to pump the flow from the wet well to the valve chamber. (e) A cast in place concrete valve chamber complete with valving and other appurtenance to allow for flow routing to a 450 mm force main. (f) Approximately 60 m of 450 mm force main that is to connect to a force main system to be installed by the force main construction team (Contract 2A). (g) A 8.3 m X 8.3 m superstructure above the dry well to house electrical and mechanical equipment. (h) A propane fuelled backup generator, vaporizer and propane tank to provide backup power to the lift station and superstructure. (i) Raising of the existing site between 1.5 to 2 m using imported fill and installation of gabion walls on the east and west sides of the project site. (j) Providing a gravel driving surface for the site. (k) A water cistern to provide wash down/site usage water to the superstructure. (l) All electrical and mechanical works needed for a fully functional dry well/wet well lift station. (m) Land drainage sewer and catch basins to provide site drainage. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Water / Sewer

$12,733,611.00

Public - City

New Construction, Site Work

311

24

30

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
193
Active Projects
133
Bidding Soon
612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

October 8, 2024

Project location map

895 Waverley St, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.