BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Fort Collins, Colorado. Contact the soliciting agency for additional information.

Stewardship Authority: Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014--Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. Project Location: The project is located approximately 55 miles northwest of Fort Collins, CO. The project is located roughly north of County Road 86 and south of County Road 80C along NFSR 169 and adjacent National Forest roads. Legal description is T10N, R73W, S 30 and 31; T10N, R74W, S 4, 5, 6, 7, 8, 9, 15, 16, 17, 18, 20, 21, 22, 23, 25, 26, 27, 28, 29, 32, 33, and 36; T10N, R75W, S 1; T11N, R73W, S 19; T11N, R74W, S 2, 9, 10, 11, 14, 15, 16, 17, 20, 21, 22, 23, 24, 26, 27, 28, 32, 33, 34, and 35; 6th P.M. Larimer County, Colorado. A site visit trip is scheduled for July 31st, at 8:00 am (MDT) at Canyon Lakes District Office, 2150 Centre Ave, Building E, Fort Collins, CO 80526. Plan on meeting at office and heading to project area. Period of Performance: All work shall be completed by September 30th, 2029. Description of Work: Services are needed to mechanically cut and remove or pile merchantable timber on 1,752 acres of FS land to improve forest health and resilience and help mitigate the risk of catastrophic wildfire. Additional services are needed to thin and pile biomass and yard unmerchantable material. Finally, rubber mats or other comparable measures will be required to ensure the protection of Larimer County roads during logging operations. Request for Proposals (RFP) are due August 26, 2024 at 12:00 p.m. MDT. The contract shall be awarded using a best value source selection method; the resulting contract shall be a firm fixed price commercial services contract. Late proposals will not be considered. NAICS: 115310: Support Services for Forestry, size standard: $34M Fuels Management Services. Stewardship authority grants the Forest Service Chief or designee the authority to aggregate contractual requirements into stewardship projects and solicit those requirements utilizing full and open competition Estimated Timber is as follows: Douglas Fir Sawtimber 48 CCF Englemann Spruce Sawtimber 171 CCF True Fir Sawtimber 266 CCF Lodgepole Pine Sawtimber 2,957 CCF Ponderosa Pine Sawtimber 14 CCF Lodgepole Pine and Other Conifers Non-Sawtimber 1,287 CCF Mandatory Work Items: 1. Cut and skid designated trees, pile unmerchantable material, and remove included timber - 856 Acres 2. Cut and Pile designated Material - 896 Acres 3.Traffic control and Installation/Removal of 2 Temporary Culverts Optional Work Items 4. Yard and Pile Unmerchantable Material - 769 Acres 5. Yard and Pile designated Material - 773 Acres 6. Cut and Pile in Optional Units - 574 Acres Send questions or interest to Katie Musser at katie.musser@usda.gov. Follow this notice for future notifications. The Awardee shall furnish all labor, materials, equipment, supervision, tools, transportation, operating supplies, and incidentals necessary to perform the work in accordance with the specifications and provisions and clauses of the contract. Bid Bonds, Payment Bonds, and Performance Bonds are not required for this project. All Contractors must be actively registered in the System for Award Management (SAM) at https://www.sam.gov/SAM/ to be eligible for award under this solicitation. If not actively registered by time of proposal evaluations, you will be found non-responsive. Registration in SAM is a free service - you do not need to pay to register in this system. If your registration is not active, you will not be considered for award. The Contracting Officer for this project is Ingrid Anderson with the National Stewardship Contracting Branch and is physically located in Bend, Oregon.

Award

Conservation and Development

$7,634,441.00

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
66
Bidding Soon
902
All Active Projects
389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2024

September 26, 2024

img_map_placeholder

Multiple Locations, Fort Collins, CO


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.