Site work for a civil project in Kwigillingok, Alaska. Completed plans call for site work for a water / sewer project.

Kwigillingok WST Platform & Raw Water Improvements Project. Liquidated Damages N/A. Question Deadline 07/09/2024 at 11:30 AM AKT Questions Due Date Online. A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents Project Description: The Project includes the following Work: Work of the Project, as described in Specification 01 10 00 Summary of Work, and Planset Sheet G-003 includes, but is not limited to, the following for the community of Kwigillingok, AK: o Phase I: o Construct a pile-supported water storage tank (WST) platform with owner-provided thermosiphons. Includes platform railing, overflow pipe extension, valve access box, interior WST inlet piping, transducer mount, inlet and outlet valve, and other associated appurtenances shown in plans and specifications. o coordinate construction activities with 3rd party water storage tank contractor o Phase II: o Construct / install new floating reservoir intake, pump, and intake piping, o Remove / dispose of existing circulating water return line in raw water transmission line (RWTL), o Replace RWTL electrical heat trace, o Construct new circulating RWTL glycol heat trace system, o Test / commission electrical heat trace and glycol heat trace systems, o Construct new chlorination contact pipe chamber inside water treatment plant, o Construct new WST fill and draw lines and heat trace in raised utilidor supported by helical piles, o Pressure test, disinfect, and commission all piping and appurtenances o Demolish existing water storage tank and piping, o Coordinate construction activities with 3rd party water storage tank contractor o Ad Alt o construct walkway float to access intake: 155lf above grade intake piping with flexible connections. The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with pile driving, platform construction, and plumbing construction. Anticipated Schedule: The Project has an expected Phase 1 substantial completion date of 30 June 2025; Phase 2 substantial completion date of 30 September 2025; with final completion date for entire of 31 October 2025. American Iron & Steel: Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Cost Range: Owner anticipates that the Work's total bid price will be approximately $4,000,000 - $5,500,000. Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

Award

Water / Sewer

$2,500,000.00

Public - Federal

Site Work

74

31

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

August 16, 2024

img_map_placeholder

To Be Determined, Kwigillingok, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.