Site work and paving for a sidewalk / parking lot in Cupertino, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
** As of August 21,2024 , this project has not yet been awarded. The project is expected to be awarded on September 4,2024.** 2024 Concrete Reconstruction Project Removal and replacement of concrete curbs, gutters and sidewalks and installation of ADA ramps at various locations throughout the city of Cupertino. Engineer's Estimate $1,550,000 Location and Description. The Project is located in City of Cupertino. Work will occur at various locations throughout the City. Work is generally described as follows: Remove/Replace existing concrete curbs, gutters and sidewalks at various locations throughout the City. Work also includes installation of ADA ramps, upgrading existing ADA ramps to current standard, removal/replacement of driveway approaches and removal/replacement of asphalt adjacent to curbs. 2.2 Time for Final Completion. . All work must be complete within 160 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about September 3, 2024, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Work will be released by the project Inspector in phases based on locations within the City's Pavement Management Grid. It is anticipated a minimum of five work releases will be issued. Question Deadline 07/17/2024 Questions or requests for clarifications regarding the Project, the bid procedures, or any of the Contract Documents must be submitted in writing to Jo Anne Johnson, Project Manager, at joannej@cupertino.org. Oral responses are not authorized and are not binding on the City. Bidders should submit any such written inquiries at least five Working Days before the scheduled bid opening. Questions received any later might not be addressed before the bid deadline. An interpretation or clarification by City in response to a written inquiry will be issued in an addendum.
Bid Results
Sidewalks / Parking Lot
$1,586,842.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2024
September 3, 2024
Multiple Locations, Cupertino, CA
Related To This Project
Cupertino, CA
Bid Date: Jul 30 2024
Cupertino, CA
--
Cupertino, CA
--
Cupertino, CA
Bid Date: Sep 12 2024
Cupertino, CA
Bid Date: Oct 29 2024
Cupertino, CA
Bid Date: Oct 04 2024
Cupertino, CA
Bid Date: Jul 25 2024
Cupertino, CA
--
Cupertino, CA
Bid Date: Jul 03 2024
Cupertino, CA
Bid Date: Jul 03 2024
Cupertino, CA
Bid Date: Jun 04 2024
Cupertino, CA
Bid Date: Jun 11 2024
Cupertino, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.