BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Moorhead, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Water, Sanitary and Storm Sewer Utilities. Concrete Paving, Curb & Gutter, Sidewalk and ADA facilities. Site Directions: Moorhead Center Mall 500 Center Avenue Est. Completion Date: Nov. 1, 2024 Major items include, but are not limited to, the following: Qty. Unit Item 621 LF CONCRETE CURB AND GUTTER TYPE B624 915 SY 8" CONCRETE PAVEMENT 639 LF 10" PVC PIPE SEWER 557 LF 12" PVC WATERMAIN 923 LF 12" to 36" RC PIPE SEWER DESIGN 3006 161 LF 36" HDPE PIPE SEWER 150 LF 48" STEEL CASING PIPE (JACKED) 13 EA DRAINAGE STRUCTURE DESIGN 4020 - 48" to 84" DIA 6 EA DRAINAGE STRUCTURE DESIGN G or H 3 EA DRAINAGE STRUCTURE DESIGN 4007 - 48" The intent of the Contract is to provide for construction and completion of the Project in every detail as described in the Plans and Specifications. It is also intended and will be expected that the work be prosecuted diligently and pressed vigorously to early completion, with due regard being given to public interests, as well as to the obligations and right of all other parties concerned. By the terms of the Contract, the Contractor assumes full responsibility for performance of the work and agrees to furnish all labor, materials, equipment, tools, supplies, transportation, and other incidentals necessary or convenient to successful completion of the project. Realizing that it would not be practical to fully describe every detail or to make specific allowances for all probable exceptions and contingencies, it is intended that the Engineer have sufficient executive authority to administer the Contract with discretion, within its general scope, so as to rule out apparent discrepancies, fulfill intentions, and allow for the exigencies of construction, on the basis of engineering judgment, giving careful consideration to all matters encumbering successful performance and completion of the project. The City Council of Moorhead shall interpret the day of completion and acceptance as being the day on which the work is accepted and final payment approved. Project Awarded to Master Construction $1,470,976

Award

Roads / Highways

$1,470,976.00

Public - City

Paving, Site Work

55

21

20

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
11
Bidding Soon
122
All Active Projects
53
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

September 16, 2024

img_map_placeholder

500 Center Ave, Moorhead, MN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.