BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2024 at 8:00 PM

Updated August 30, 2024

Renovation of a water / sewer project in Costa Mesa, California. Working plans call for the renovation of a water / sewer project.

**As of August 29, 2024 All bids have been rejected.. As of this time it is unknown if an when project will rebid. The project includes installing a blower, vent pipe extension, and associated electrical work at the Elden Pump Station, located on the northeast side of Mesa Drive at Elden Avenue, in Costa Mesa, California. The area of construction will be located behind the curb on Mesa Drive, out of the roadway. All questions regarding the project must be submitted by 5:00 PM Friday July 26, 2024. Questions must be submitted by email to DSaidi@RobHamers.com Each bid shall be submitted on the Bid Proposal Form furnished as part of the contract documents, and shall be accompanied by a certified check, a cashiers check or a bidders bond in an amount not less than 10-percent of the amount of the bid. Liquidated damages in the sum of $250 per day shall be imposed for each unexcused day beyond the contract completion date The Board of Directors of the District reserves the right to select the schedule(s) under which the bids are to be compared and contract(s) awarded, to reject any and all bids, and to waive any and all irregularity in any bid.

Final Planning

Water / Sewer

$163,432.00

Public - City

Renovation

7

10

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
706
Active Projects
353
Bidding Soon
3,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

February 28, 2025

Project location map

Elden Ave, Costa Mesa, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.